SCP-1087
Safe
~
medium confidence
SCP-1087
Expected annual
$1.9M
One-time setup
$1.4M
Annual recurring
$1.9M
Personnel
14
One-time capital to establish a sealed, scrubbed arboretum and monitoring systems is approximately $1.37M; recurring annual operating costs are about $1.914M, driven mainly by staff wages, an active research program, and incident readiness/response.
One-Time Capital Costs
Total: $1.4M
Annual Recurring Costs
Total: $1.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.9M/yr
Normal year with planned operations, routine maintenance, and no major incidents.
routine_operations
no_incidents
🚨
Minor Incident
$2.1M/yr
Small containment incident or localized exposure requiring cleanup, overtime, and limited contractor support.
accidental_exposure
minor_hvac_failure
limited_breach
🚨
Major Breach
$3.1M/yr
Significant containment failure requiring full incident response, extended decontamination, external contractors, and potential temporary decommissioning.
large_power_outage
simultaneous_system_failures
major_contamination_event
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#6] 24/7 containment security staffing across shifts (includes supervisor coverage). |
| Research Scientist | 2 | [#7, #14] Senior scientists leading biochemical analysis and countermeasure research; staffed full-time. |
| Research Technician / Animal Handler | 2 | [#7, #12, #11] Technicians and animal handlers to maintain colonies, run night testing windows, and conduct routine husbandry. |
| Engineer / Maintenance | 1 | [#2, #16, #21] Facilities/engineering support for HVAC, plumbing, generators and redundancy maintenance. |
| Administrative Staff | 1 | [#8, #19] Administrative/compliance staff to manage records, procurement, D-class scheduling, and cover-story paperwork. |
| Veterinary Contractor | 0 | [#7, #11] Part-time or contracted veterinary services (treated as contracted expense rather than full-time headcount). |
Confidence Notes
Estimates are based on analyst-provided ranges and typical institutional costs; many line items have wide ranges (especially staff/incident costs) and site-specific variability (existing infrastructure, local wages), so medium confidence is appropriate.