SCP-1108
Uncontained
~
medium confidence
SCP-1108
Expected annual
$5.0M
One-time setup
$2.1M
Annual recurring
$4.6M
Personnel
11
Initial capital expenditures are approximately $2.1M driven by facility buildout, lab/setup, transport and sensor purchases; recurring baseline operations are roughly $4.58M/yr driven by staff wages, contingency reserves, emergency response and research programs.
One-Time Capital Costs
Total: $2.1M
Annual Recurring Costs
Total: $4.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.6M/yr
Normal operational year with routine monitoring, occasional small deployments, and no major property-damage incidents.
regular_monitoring
small_scale_field_deployments
no_major_flooding_or_media_exposure
🚨
Minor Incident
$4.7M/yr
Localized animal influx or small canal rise requiring multiple rapid deployments, short charters, and modest property reparations.
localized_alligator_infestation
short_term_charter_or_additional_sorties
limited_property_damage
🚨
Major Incident
$7.1M/yr
Widespread freshwater rise, multiple property damages, fatalities or heavy media exposure requiring large reparations, evacuations and major legal settlements.
widespread_flooding
multiple_property_losses
fatalities_or_extensive_media_attention
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Meteorologist | 3 | [#2] Atmospheric scientists (continuous monitoring, modelling, authorizing response). |
| Field Response Technician / Handler | 8 | [#6] Capture crews including handlers, medics and security for rapid deployment (6–10 staff aggregated). |
Confidence Notes
Estimates are assembled from analyst ranges provided; many line items have wide ranges and per-event costs are highly scenario-dependent (property damage, settlements, and contingency reserves dominate variance). Medium confidence reflects detailed operational line items but significant uncertainty about event frequency and scale.