SCP-1112
Safe
~
medium confidence
SCP-1112
Expected annual
$584K
One-time setup
$2.0M
Annual recurring
$564K
Personnel
7.5
Up-front fit-out, equipment and contingency reserves are the primary one-time costs (~$2.0M driven by preservation and high-risk reserves); steady-state annual operations (security, research staff, monitoring, consumables) are the main recurring cost (~$564k/yr).
One-Time Capital Costs
Total: $2.0M
Annual Recurring Costs
Total: $564K/yr
Cost Scenarios
📊
Baseline
(baseline)
$564K/yr
Routine year with no major incidents; normal operations, maintenance, subject testing and small refreshes only.
regular_testing
scheduled_maintenance
no_incidents
🚨
Minor Incident
$584K/yr
Localized event such as accidental damage, minor infestation, or a testing-related adverse reaction requiring repair/treatment and additional clinical support.
minor_physical_damage
pest_treatment
additional_conservation
🚨
Major Breach
$1.1M/yr
Theft, significant damage, or security breach requiring large-scale emergency response, replacement containment measures, major PR and legal work.
theft_or_destructive_breach
unauthorized_public_exposure
🚨
Legal Repatriation
$864K/yr
Sustained legal/diplomatic action by a claimant government or institution resulting in legal defense costs, negotiated settlement, or repatriation expenses.
provenance_claim
diplomatic_action
litigation
🚨
Psychogenic Mass Effect
$5.6M/yr
Catastrophic public exposure or uncontrolled display leading to mass psychological harm, large-scale litigation, government involvement and major containment expansion.
unauthorized_public_display
mass_exposure
major_litigation
Personnel
7.5 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#7] Three-shift 24/7 coverage with rotation and leave (6 total guards). |
| Research Scientist / Curator | 1 | [#6] Curatorial/archaeological researcher responsible for approvals, scheduling and provenance research (approx. 0.5–1.0 FTE; budgeted as 1 FTE-equivalent here). |
| Conservator | 0.5 | [#4, #6, #26] Partial FTE conservator responsible for conservation treatments, monitoring and in-situ work (part-time/shared). |
Confidence Notes
Estimates are midpoints taken from analyst ranges and the SCP text; recurring operations are well-described (higher confidence), but contingency/reserve needs (legal, repatriation, psychogenic mass-effect) are highly uncertain and drive wide variance.