SCP-114
Euclid
~
medium confidence
SCP-114
Expected annual
$1.9M
One-time setup
$2.1M
Annual recurring
$1.8M
Personnel
17
Initial capital build (shaft + reinforced cell) and remote/robotic equipment drive one-time costs (~$2.1M); ongoing annual costs (~$1.85M/yr) are dominated by security staffing, technical maintenance, administrative overhead and a 20% operating contingency.
One-Time Capital Costs
Total: $2.1M
Annual Recurring Costs
Total: $1.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.8M/yr
Normal year with routine operations, no major incidents; includes security, maintenance, medical operations, legal/cover and contingency reserve.
routine_operations
no_incidents
🚨
Minor Incident
$2.1M/yr
Isolated violent incident among proximate personnel requiring medical response, limited cleanup and investigation.
localized_violence
medical_claims
forensic_cleanup
🚨
Major Incident
$3.0M/yr
Large-scale incident or elimination requiring major remediation, legal settlements, replacement/repair of containment and long-term remediation.
elimination_operation
major_cleanup
large_settlements
🚨
Political Exposure
$2.2M/yr
Media/FOIA exposure or local government scrutiny forcing expensive legal, PR, and operational changes.
FOIA_or_media_inquiry
local_authority_inspections
Personnel
17 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#9] Rotating remote-monitoring guards assigned to 24/7 surveillance shifts (part of security staffing budget). |
| Security Supervisor | 2 | [#9] On-site supervisors coordinating remote monitoring, response protocols and liaison with MTF units. |
| Engineer / Maintenance | 4 | [#10, #17] Containment technicians and contractors responsible for dumbwaiter, HVAC, electrical, robotics and generator maintenance. |
| Medical Officer | 1 | [#11] On-call/part-time medical/psychiatric support for triage and staff mental-health programs (allocated in medical operational budget). |
| Administrative Staff | 2 | [#23] Pro-rated HR, accounting and administrative support allocated to this containment. |
Confidence Notes
Analyst notes give detailed line items and ranges enabling a reasoned estimate, but wide ranges for construction, liability reserves and incident severity produce moderate uncertainty.