SCP-116
Euclid
~
medium confidence
SCP-116
Expected annual
$8.4M
One-time setup
$7.5M
Annual recurring
$8.3M
Personnel
41
One-time setup and reserve costs are approximately $7.47M driven by construction, specialized research/lab setup, and contingency reserves; annual recurring operations are approximately $8.33M/yr driven primarily by security staffing, medical/psych care, research operations, and disability/reserve provisioning.
One-Time Capital Costs
Total: $7.5M
Annual Recurring Costs
Total: $8.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$8.3M/yr
Routine year with no major incidents; containment and research operate at planned levels.
standard_operations
scheduled_research
normal_staff_rotation
🚨
Minor Incident
$8.5M/yr
Minor internal incident (localized padding damage, staff exposure requiring additional short-term treatment, limited equipment replacement).
internal_injury
padding_repair
increased_psych_care
🚨
Major Breach
$9.8M/yr
Significant containment failure requiring extended lockdown, major repairs/replacement of containment cell, expanded medical treatment, and temporary research halt.
partial_containment_failure
multiple_injuries
extended_shutdown
🚨
Catastrophic Breach
$16.3M/yr
Full-scale failure with public exposure, large-scale medical/disability claims, legal action, site relocation and heavy use of contingency reserves.
complete_breach
public_exposure
mass_treatment_and_litigation
Personnel
41 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 30 | [#6] 6 agents per shift pattern (4 corners + 2 with SCP) with rotations; rostered to 30 personnel for 24/7 coverage (includes spares). |
| Supervisory Staff / Site Security Manager / Administrative | 5 | [#7] Shift leads, scheduling, HR and logistics (midpoint of 4–6 staff). |
| Medical Officer | 3 | [#8] On-call physician and nursing staff for on-site emergency care and minor procedures. |
| Psychologist / Counselor | 3 | [#9] Mental-health professionals providing weekly psychiatric monitoring and testing for monitoring agents (costs included in staff_wages). |
Confidence Notes
Analyst notes provide detailed line items for most cost centers (staffing, construction, research) allowing a medium-confidence estimate; several items (severity/frequency of medical disability, R&D success/failures, and contingency sizing) remain uncertain, requiring assumptions and mid-point choices.