SCP-1164
Safe
~
medium confidence
SCP-1164
Expected annual
$2.9M
One-time setup
$10.2M
Annual recurring
$2.8M
Personnel
21
Initial setup is capital-intensive (~$10.2M) driven primarily by stainless-steel refacing within 50m and mobile/remote handling procurement; recurring annual costs are ~ $2.85M dominated by staff wages, insurance, and logistics/containment readiness.
One-Time Capital Costs
Total: $10.2M
Annual Recurring Costs
Total: $2.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.8M/yr
Normal year with no significant incidents; routine operations, maintenance, and research continue.
no incidents
regular maintenance
scheduled research
🚨
Minor Incident
$3.0M/yr
Localized accidental contact or small transfer event requiring emergency medical response, limited repairs, and cleanup.
PPE failure
single-person contact
small transfer to nearby stone piece
🚨
Major Breach
$5.3M/yr
Significant off-site transfer or multi-victim absorption requiring large-scale recovery, legal action, compensation and media management.
multi-person contamination
public exposure
large transfer to public infrastructure
🚨
Mobile Containment Deployment
$3.6M/yr
SCP-1164 manifests off-site or transfers to an external object requiring mobilization of mobile containment unit and heavy transport to re-locate containment.
off-site manifestation
transfer to inaccessible concrete
need for emergency relocation
Personnel
21 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | [#9] 24/7 security coverage and screening (6–8 guards + supervisors across shifts converted to total on-staff and coverage number). |
| Research Scientist | 5 | [#10, #16] Materials scientists and containment researchers dedicated to experiments and monitoring. |
| Engineer / Maintenance | 3 | [#5, #6, #20] Engineers and technicians for crane/robot maintenance, remote-handling systems and facility upkeep. |
| Medical Officer | 1 | [#11] On-call trauma/surgical capability for emergency amputations and immediate response. |
| Administrative Staff | 1 | [#17] Permitting, contracting, and liaison with local authorities; cover-story coordination. |
| Site Director / Executive Staff | 1 | [#9, #10, #17] Senior oversight, program coordination and executive decision-making for containment policy. |
Confidence Notes
Analyst notes provide detailed line-item ranges for most costs (construction, cladding, handling equipment) enabling reasonable mid-point estimates, but site-specific variation (local labor, extent of 50m refacing, and insurance/legal outcomes) creates moderate uncertainty.