SCP-1170
Euclid
~
medium confidence
SCP-1170
Expected annual
$4.0M
One-time setup
$6.7M
Annual recurring
$4.0M
Personnel
27
Initial one-time setup is approximately $6.71M driven largely by property acquisition and initial equipment/vehicle purchases; annual recurring costs are approximately $3.92M driven primarily by security and research staff wages, legal/cover operations, and monitoring/forensics.
One-Time Capital Costs
Total: $6.7M
Annual Recurring Costs
Total: $4.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.0M/yr
Normal operational year with no major incidents; Foundation owns the property and operates with purchased assets and standard recurring budgets.
no incidents
standard monitoring & maintenance
🚨
Minor Incident
$4.0M/yr
A localized incident requiring forensic work, biohazard cleanup, limited PR/legal action, and replacement of some equipment.
biohazard cleanup
forensic testing surge
limited media exposure
🚨
Major Breach
$4.5M/yr
Significant event (e.g., disappearance of multiple personnel or large equipment losses) requiring emergency response, heavy legal/PR expenditure, and potential decontamination or partial decommissioning.
multiple disappearances
major public exposure
large-scale equipment loss
Personnel
27 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 15 | Full-time guards providing 24/7 coverage with three-hour shifts; pool sized for rostering and leave/backfill. [#4] |
| Security Supervisor / Administrative Staff | 3 | Shift supervisors, clearance officers, scheduling and HR for rotations and discipline. [#5] |
| Research Scientist / Technician | 5 | Parapsychology/memetics experts, cognitive scientists, physicists, and data specialists for study and monitoring. [#15] |
| Incident Response Team | 3 | Tactical/rapid extraction team trained for memetic hazards and retrieval; supports security in incidents. [#18] |
| Medical Officer / Counselor | 1 | Onsite medical/psychological support integrated with counseling and memetic countermeasures program. [#14] |
Confidence Notes
Line-item ranges in analyst notes are moderately well-specified for staffing and equipment, but property acquisition vs lease choices and incident frequency introduce uncertainty; estimates use mid-range assumptions and include contingency to account for variability.