SCP-1175
Euclid
?
low confidence
SCP-1175
Expected annual
$5.4M
One-time setup
$19.4M
Annual recurring
$5.4M
Personnel
33
One-time capital requirements are approximately $19.36M, driven primarily by land/control measures, contingency reserves, tactical vehicles, and sensor/communications equipment. Recurring annual costs are approximately $5.36M, dominated by staff wages (security and research), R&D/monitoring, and vehicle/equipment maintenance.
One-Time Capital Costs
Total: $19.4M
Annual Recurring Costs
Total: $5.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.4M/yr
Normal operational year with no major incidents; standard monitoring, staffing, and R&D continue.
routine_monitoring
no_incidents
🚨
Minor Incident
$5.5M/yr
Single localized incident (one statue attacks a temporary/unauthorized structure or a small on-site injury) requiring emergency response, a removal operation, and limited repairs.
single_structure_attack
minor_casualty
rapid_removal_operation
🚨
Major Incident
$6.9M/yr
Significant attack on a nearby structure or a highway incident causing multiple casualties, requiring heavy emergency response, forensic work, legal payouts, and partial use of contingency/reserve funds.
structure_demolition
multiple_casualties
state_infrastructure_impact
🚨
Catastrophic Breach
$15.4M/yr
Mass activation or cascading failures requiring large-scale buyouts, demolition/engineering contracts, major public-exposure mitigation, and large contingency drawdown.
mass_activation
widespread_destruction
political_exposure
Personnel
33 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent (rapid-response tactical) | 8 | 24/7 armed containment team (note #5); tactical wages included in staff_wages. |
| Mobile Outpost Operator / Driver | 6 | Operators to move and man OP-1175-1 (note #3); wages included in staff_wages. |
| Undercover Park Security (cover guards) | 4 | Daytime removal of unauthorized visitors and visible deterrent (note #4); wages included in staff_wages. |
| Research Scientist / Technician | 8 | Core research team (physics, geology, materials, behavioral) responsible for monitoring and R&D (note #12); salaries included in staff_wages. |
| Public-facing Park Staff | 4 | Cover-story staff (office/gift shop, visitor services) (note #16); wages included in staff_wages. |
| Medical Officer / On-call Trauma | 1 | On-call trauma team capability represented as salary-equivalent/contract baseline (note #20); baseline costs included in staff_wages/medical_forensics. |
| Administrative Staff / Program Management | 2 | Program manager(s), bookkeeping, procurement and coordination (note #30); wages included in staff_wages. |
Confidence Notes
High uncertainty in location-dependent land/easement costs, low-frequency high-severity incident probabilities, and potential unknown technical costs for drilling/retrieval or full decommissioning. Many analyst estimates were ranges and subject to regional variation and operational posture choices.