SCP-1176
Euclid
~
medium confidence
SCP-1176
Expected annual
$1.1M
One-time setup
$1.2M
Annual recurring
$1.1M
Personnel
13
Initial capital (facility buildout, containment hardware, optional on-site incinerator, and reserves) is roughly $1.23M one-time; annual operations (personnel, waste handling, research, training, and contingencies) are roughly $1.10M/year, driven primarily by staff wages and research/monitoring.
One-Time Capital Costs
Total: $1.2M
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal year with no major incidents; routine containment, monitoring, waste disposal, research, and training.
routine operations
daily draining and disposal
scheduled maintenance and testing
🚨
Minor Incident
$1.2M/yr
Localized spill or small exposure event requiring medical treatment, decontamination, replacement of consumables, and limited investigation.
small spill
single-person exposure
minor containment breach
🚨
Major Breach
$1.6M/yr
Significant containment breach or accidental distribution causing multiple hospitalizations, large-scale decontamination, legal/PR response, and extended investigations.
multiple exposures
public discovery requiring PR/legal action
major decontamination
🚨
Catastrophic Breach
$6.1M/yr
Widespread exposure or public-health level incident requiring large-scale emergency response, prolonged litigation, and major recovery operations.
mass exposure
public-health emergency
nation-scale mitigation
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#6] Continuous guarded post; 8 full-time guard personnel assigned (salary+benefits included in staff_wages). |
| Hazmat Technician / Medical Technician | 2 | [#7] 2 personnel on partial assignment (combined ~0.5–1.0 FTE as budgeted). |
| Research Scientist | 2 | [#8] Research staff (1.5–3.0 FTE total budgeted; represented as ~2 headcount here, salaries + lab overhead included). |
| EEG Technician | 1 | [#5] Technician time (~0.2 FTE) for EEG monitoring during removals; represented as one assigned technician (part-time duties). |
Confidence Notes
Estimates are based on detailed analyst line items and typical site costs, but ranges are wide for optional capital (incinerator), contingency reserves, and staff compensation variations; adversarial/breach scenarios are highly uncertain.