SCP-1241
Neutralised
~
medium confidence
SCP-1241
Expected annual
$916K
One-time setup
$959K
Annual recurring
$901K
Personnel
8
Up-front capital (site works, transmission stations, and RF/recording lab) dominates one-time costs (~$959k), while recurring annual costs are driven by personnel, legal/cover maintenance, and site operations (~$900.8k/yr).
One-Time Capital Costs
Total: $959K
Annual Recurring Costs
Total: $901K/yr
Cost Scenarios
📊
Baseline
(baseline)
$901K/yr
Normal year with no incidents; routine monitoring, maintenance, staffing and cover-story upkeep.
no containment incidents
routine operations only
🚨
Minor Incident
$1.0M/yr
Localized containment incident or community complaint requiring PR response, limited compensation and emergency repairs.
local exposure/complaint
interference with civilian services
minor equipment failure
🚨
Major Escalation
$2.4M/yr
Neutralization failure or significant propagation/exposure causing large-scale response: national coordination, mass suppression/evacuation and extended operations.
widespread propagation
major containment failure
public exposure requiring national response
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Senior Analyst | 1 | [#5] Lead researcher responsible for content review and escalation (~$90k salary equivalent included in staff_wages). |
| RF Engineer / Technician | 1 | [#5] Responsible for transmitter, receiver and sensor hardware maintenance (~$70k salary equivalent included in staff_wages). |
| Media Archivist / IT Admin | 1 | [#5] Manages archives, backups and air-gapped systems (~$50k salary equivalent included in staff_wages). |
| Security Officer / MTF Agent | 3 | [#6] On-site guards and patrol staff for transmit/receive sites (2–4 guards; midpoint 3 included in staff_wages). |
| Field Liaison / Field Technician | 2 | [#7] Local field containment team and liaison officers for inspections and community interaction (2 full-time staff included in staff_wages). |
Confidence Notes
Analyst notes provide detailed line-item ranges allowing reasonable midpoint estimates, but conditional incident costs and variability in site/rental choices introduce moderate uncertainty.