SCP-1292
Euclid
~
medium confidence
SCP-1292
Expected annual
$2.1M
One-time setup
$1.8M
Annual recurring
$2.0M
Personnel
12
Estimated one-time startup and containment setup costs are approximately $1.85M–$1.9M driven by secure storage, lab R&D setup, and a contingency reserve; annual recurring operations are roughly $2.0M/year driven by staff wages, field inspection operations, disposal/logistics, legal/PR, and ongoing research/monitoring.
One-Time Capital Costs
Total: $1.8M
Annual Recurring Costs
Total: $2.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.0M/yr
Normal year with no major incidents; routine discovery, maintenance, monitoring, and training.
no_widespread_outbreak
regular_inspections
routine_replacements
🚨
Minor Incident
$2.2M/yr
Localized outbreak in one or a few institutions requiring targeted quarantines, disposal, replacements, and legal/PR work.
localized_quarantine
targeted_incineration
small_scale_replacement
🚨
Major Outbreak
$3.5M/yr
Regional/state-level outbreak affecting hundreds to thousands of devices requiring mass replacements, large legal exposure, and wider public remediation.
regional_spread
mass_replacement
litigation_and_retakes
🚨
National Outbreak
$27.0M/yr
Widespread national exposure across multiple exam boards and jurisdictions triggering mass retesting, large settlements, and national replacement effort.
multi-jurisdiction_spread
mass_retakes
major_litigation
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 4 | [#11] Embedded research/scientist staff included in staff_wages to study fault mechanism and mitigation. |
| Engineer / Maintenance | 2 | [#11] Embedded engineers and firmware reverse-engineers (included in research team salary pool). |
| Security Officer / MTF Agent | 5 | [#19] Containment response/security staff on payroll for incident response and secure handling. |
| Administrative Staff | 1 | [#11, #19] Program/administrative support included in staff_wages for coordination and reporting. |
Confidence Notes
Estimates are built from analyst-provided ranges and mapped to a regional/state-level operational baseline; ranges and spread mechanics (latency, unknown transmission) introduce uncertainty, but many cost categories are concrete (disposal, wages, hardware). Scenario probabilities are qualitative inferences.