SCP-1294
Euclid
~
medium confidence
SCP-1294
Expected annual
$3.9M
One-time setup
$4.1M
Annual recurring
$3.8M
Personnel
14
Initial one-time capital and containment setup is approximately $4.12M, primarily driven by BSL-3 lab retrofitting, containment room construction, and an incident-response reserve. Annual operating costs are about $3.82M/year, dominated by personnel, emergency incineration retainer, MTF logistics and research/monitoring.
One-Time Capital Costs
Total: $4.1M
Annual Recurring Costs
Total: $3.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.8M/yr
Normal year with no major incidents; routine operations, research, training and MTF rotations.
routine_operations
scheduled_research
regular_mtfs
🚨
Minor Incident
$4.2M/yr
Localized release or limited staff exposure requiring site decontamination, overtime, small emergency incineration, limited PR/legal response and additional MTF activity.
small_release_inside_site
limited_staff_exposure
localized_decontamination
🚨
Major Breach
$5.6M/yr
Large-scale containment breach or public exposure requiring broad remediation, mass incineration, extensive legal/PR response and possible settlements.
large_scale_release
public_exposure
mass_remediation
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Containment Technician | 4 | [#9] Full-time containment technicians for day-to-day care and operations. |
| Engineer / Maintenance | 1 | [#9] Specialized maintenance technician for HVAC, robotics and BSL systems. |
| Containment Lead | 1 | [#9] Lead specialist overseeing containment procedures and operations. |
| Security Officer / MTF Agent | 4 | [#10] Armed/cleared guards for 24/7 site access control and chamber security. |
| Medical Officer (Physician) | 1 | [#11] On-call physician for acute exposures and oversight. |
| Medical Officer (Nurses) | 2 | [#11] Nursing staff for continuous medical support and decontamination. |
| Medical Mental Health (Psychiatrist/Psychologist) | 1 | [#11] Mental health specialist for psychological screening, treatment and follow-up. |
Confidence Notes
Many line items are well-specified (containment engineering, staffing, lab retrofit) giving moderate confidence in capital and baseline recurring estimates, but large contingency items (emergency incineration retainer, incident response reserve, insurance/litigation) carry high uncertainty, so overall confidence is medium.