SCP-1301
Safe
~
medium confidence
SCP-1301
Expected annual
$970K
One-time setup
$876K
Annual recurring
$956K
Personnel
12
Initial one-time buildout and equipment are estimated at $876,000, driven primarily by the anechoic containment cell, redundant replication, contingency fund and specialized equipment. Annual recurring costs are estimated at $956,200/yr, dominated by security and staff wages, research programs, and legal/cover operations.
One-Time Capital Costs
Total: $876K
Annual Recurring Costs
Total: $956K/yr
Cost Scenarios
📊
Baseline
(baseline)
$956K/yr
Normal year with no major incidents; routine operations, research and maintenance only.
routine_operations
scheduled_research
no_incidents
🚨
Minor Incident
$996K/yr
Small containment event or single-person contamination requiring quarantine, additional medical care and overtime.
single_contamination
minor_hardware_failure
staff_error
🚨
Major Breach
$1.5M/yr
Significant containment failure or transport accident causing multiple exposures, relocation, legal action and major repairs.
structural_failure
multiple_exposures
transport_accident
🚨
Research Breakthrough Requiring Scale Up
$1.3M/yr
Year in which research is expanded substantially (large-scale human studies, new equipment procurement and temporary hires).
expanded_research
equipment_purchase
additional_staffing
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 7 | 24/7 contracted guards and supervisors covering perimeter and immediate response; cost included in staff_wages [#6]. |
| Containment Response Team | 4 | On-call specialists trained in silent entry and emergency muffle procedures; included in staff_wages [#7]. |
| Specialist Conservator | 1 | Luthier/instrument conservator retainer for instrument care and controlled handling; included in staff_wages [#15]. |
Confidence Notes
Estimates are based on analyst-provided ranges and a straightforward containment profile (Safe), but many line items have wide ranges (e.g., construction finish level, staffing choices, contingency sizing) leading to moderate uncertainty.