SCP-1332
Euclid
~
medium confidence
SCP-1332
Expected annual
$2.9M
One-time setup
$12.9M
Annual recurring
$2.9M
Personnel
12
Initial capital expenditures are approximately $12.9M, driven by construction of a remote hardened containment wing, sacrificial holding cells and specialized infrastructure; recurring annual operating costs are ~ $2.87M driven by specialized staff, ongoing research, maintenance and large contingency reserves for possible thermobaric sterilization events.
One-Time Capital Costs
Total: $12.9M
Annual Recurring Costs
Total: $2.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.9M/yr
Normal uneventful year with scheduled operations, maintenance, research and reserve set-asides; no thermobaric detonations or major incidents.
no_breach
routine_maintenance
ongoing_research
🚨
Minor Incident
$2.9M/yr
Small containment breach or equipment failure requiring local cleanup, repairs and limited EOD/medical response but no thermobaric sterilization.
local_spill
equipment_failure
limited_eod_response
🚨
Major Breach
$4.4M/yr
Containment failure leading to use of controlled thermobaric sterilization, demolition of sacrificial cell(s), extensive cleanup, environmental testing and public-safety response.
structural_failure_of_cell
SCP-1332-C_escape
require_thermobaric_sterilization
🚨
Research Breakthrough Requiring Scale Up
$3.9M/yr
Successful R&D or regulatory change that requires one-time scale-up investment to deploy a new non-destructive sterilization/treatment or large clinical trials.
successful_pilot
clinical_scaleup
regulatory_trials
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | [#8] 24/7 armed security rotation (4 full-time guards assumed). |
| Containment Technician | 3 | [#9, #24] Daily inspection staff and custodial technicians to service cells, change panels and handle specimen transfers. |
| Medical Officer | 1 | [#10] On-site physician for immediate medical assessment and oversight. |
| Nurse | 2 | [#10] Nursing staff to provide emergency response and ongoing monitoring. |
| Engineer / Maintenance | 1 | [#6, #4] On-site maintenance engineer for HVAC/generator/site systems and rapid repairs. |
| Administrative Staff | 1 | [#28, #19] Clerical, recordkeeping and liaison duties including classified logs and permit administration. |
Confidence Notes
Analyst notes provide detailed line items and ranges so core cost drivers and recurring categories are well-identified, but large per-incident cost variability (thermobaric sterilization and reconstruction) and uncertain incident frequencies reduce confidence to medium.