SCP-1334
Euclid
~
medium confidence
SCP-1334
Expected annual
$688K
One-time setup
$819K
Annual recurring
$661K
Personnel
17
Initial setup is dominated by facility acquisition, instrumentation, and contingency reserves (total one-time ≈ $819,000). Recurring costs are driven by research staff, security staffing, and program overhead (≈ $661,000/yr).
One-Time Capital Costs
Total: $819K
Annual Recurring Costs
Total: $661K/yr
Cost Scenarios
📊
Baseline
(baseline)
$661K/yr
Normal, uneventful year with routine monitoring, research, and maintenance.
routine operations
scheduled experiments
no medical emergencies
🚨
Minor Incident
$736K/yr
Single-site incident requiring medical response, limited deployment, equipment replacement, and PR activity.
isolated medical emergency
unexpected destructive object behavior
small containment repair/deployment
🚨
Major Breach
$1.5M/yr
Significant containment breach or public exposure requiring evacuation, large-scale medical response, buyouts, and major legal action.
mass health effects/multiple casualties
public exposure
evacuation of surrounding area
Personnel
17 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 5 | Daytime contractor-guards rotating to maintain two on duty as described [#2]. |
| Remote Monitoring Analyst | 2 | Night/remote surveillance monitoring and alarm response [#3]. |
| Research Scientist | 3 | Anomalous properties research and experiment leads [#8]. |
| Research Technician | 2 | Lab support, instrumentation operation, and sample handling [#7, #14]. |
| Medical Officer | 1 | On-call medical monitoring and phlebotomy/CBCs coordination [#9, #10]. |
| Engineer / Maintenance | 1 | Generator/HVAC and access-control maintenance [#6, #18]. |
| Security / Rapid Response | 2 | On-call rapid containment/response allocation reflected in readiness costs [#19]. |
| Administrative Staff | 1 | Program admin, procurement and liaison support included in overhead [#23, #16]. |
Confidence Notes
Estimates are assembled from analyst-provided ranges and typical Foundation cost assumptions; many line items (property acquisition, contingency, staff models) have wide ranges so totals are mid-range estimates rather than precise quotes.