SCP-1357
Safe
~
medium confidence
SCP-1357
Expected annual
$7.8M
One-time setup
$8.9M
Annual recurring
$7.7M
Personnel
61
Estimated one-time startup/capital costs are approximately $8.93M driven primarily by land acquisition, perimeter hardening, and initial contingency; annual recurring operations are approximately $7.735M/yr driven by security staffing, R&D/monitoring, and contingency/reserve allocations.
One-Time Capital Costs
Total: $8.9M
Annual Recurring Costs
Total: $7.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.7M/yr
Normal year with no major incidents; steady-state operations and scheduled R&D/testing.
routine monthly retrievals
scheduled testing and R&D
no breaches or public exposures
🚨
Minor Incident
$8.2M/yr
Small-scale breach or localized manifestation requiring emergency response, targeted amnestic campaign, and legal/PR actions.
localized public incident
small containment breach
limited MTF deployment
🚨
Major Breach
$10.2M/yr
Significant containment failure or public exposure requiring large-scale emergency response, mass amnestic operations, extended PR/legal campaigns and potential site remediation.
mass manifestation or widespread SCP-1357-B distribution
public exposure / media attention
multi-day MTF operations and remediation
Personnel
61 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 31 | [#1] Minimum continuous perimeter staffing: 8guards per shift × 3 shifts + relief/supervisors as specified in note #1. |
| Rapid Response / Specialized MTF | 12 | [#2] Dedicated quick-reaction containment team on call, per note #2. |
| Medical Officer / EMT / PA | 5 | [#3, #12] On-shift medics to administer amnestics and staff to monitor Class-A subjects for two months (notes #3 and #12). |
| Research Scientist | 4 | [#26, #18] Specialized containment and memetic research staff supporting ongoing R&D and lab analyses (notes #26 and #18). |
| Engineer / Maintenance | 4 | [#5, #7, #21] Facilities, generator, ride stabilization, and equipment maintenance staff (notes #5, #7, #21). |
| Administrative Staff / Records Cataloging | 3 | [#10, #14, #17] Records room/cataloging staff, logistics coordinators, and administrative time apportioned to this project (notes #10, #14, #17). |
| Site Director / Executive Staff | 2 | [#14] Senior-level personnel whose time/approval overhead is allocated to project recurring costs (note #14). |
Confidence Notes
Many line items are well-specified (guard staffing, surveillance, amnestic costs) allowing mid-confidence estimates, but significant uncertainty remains in land acquisition costs, frequency/scale of SCP-1357-B distribution, and contingency events; ranges in analyst notes required mid-point selections for several large categories.