SCP-1362
Euclid
~
medium confidence
SCP-1362
Expected annual
$4.8M
One-time setup
$5.1M
Annual recurring
$4.7M
Personnel
16
Estimated first-year one-time costs are approximately $5.10M driven by Arctic base construction, mobilization, and equipment purchases; annual recurring costs are approximately $4.73M driven by staffing, fuel/logistics, research, and rapid-response/retainer reserves.
One-Time Capital Costs
Total: $5.1M
Annual Recurring Costs
Total: $4.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.7M/yr
Normal operational year with no major incidents; routine staffing, fuel, research, maintenance and reserves only.
steady containment operations
no public exposure
routine research cadence
🚨
Minor Incident
$5.0M/yr
Localized incident: trespasser confrontation, vehicle-blocking by SCP-1362-1, small contamination or several detentions requiring extra mobilization and media suppression.
trespassers/vehicle blockade
several detentions/amnestics
limited contamination requiring targeted remediation
🚨
Major Breach
$7.2M/yr
Significant public exposure or environmental contamination requiring large-scale remediation, international diplomatic/legal action, extended mobilization and contractor hires.
mass civilian exposure
major soil/atmospheric contamination
international media or diplomatic incident
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#5] Permanent security force to maintain perimeter, respond to trespassers and perform patrol rotations. |
| Research Scientist | 4 | [#5, #15] Scientists conducting ongoing experiments, analysis of smoke signals, atmospheric and toxicology testing. |
| Technician / Support Staff | 4 | [#5, #19] Technical support for vehicles, generators, UAVs, lab instruments and base maintenance. |
| Medical Officer | 1 | [#5, #11] On-site medic for routine care and post-amnestic medical monitoring; medevac handled via retainer. |
| Administrative Staff / Logistics | 1 | [#5, #27] Logistics, procurement, liaison and cover-story administration. |
Confidence Notes
Analyst notes provide detailed component ranges and dominant cost drivers (Greenland logistics, staffing, fuel), but substantial variability remains from site-access modality, fuel/transport price volatility, frequency of public contact, and contingency activations; hence medium confidence.