SCP-1406
Safe
~
medium confidence
SCP-1406
Expected annual
$1.7M
One-time setup
$1.2M
Annual recurring
$1.7M
Personnel
14
Initial setup and equipment (site purchase/containment modifications, in-house lab setup) drive one-time costs; recurring costs are dominated by security and research staff wages plus overhead and ongoing testing/monitoring.
One-Time Capital Costs
Total: $1.2M
Annual Recurring Costs
Total: $1.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.7M/yr
Normal year with routine operations, monitoring, and no major incidents.
routine_operations
scheduled_testing
no_incidents
🚨
Minor Incident
$1.8M/yr
Localized event such as a small uncontrolled exothermic reaction, minor contamination, or equipment failure requiring cleanup and limited repairs.
localized_fire
minor_contamination
equipment_failure
🚨
Major Breach
$2.3M/yr
Significant containment/visibility incident causing extended cleanup, legal action, replacement of equipment, possible temporary relocation and public exposure mitigation.
breach
significant_fire
media_exposure
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 7 | [#4] Six guards for 24/7 coverage plus one supervisor as described in security staffing estimates. |
| Research Scientist / Chemist | 2 | [#15] Chemists for analytical work and sample interpretation (1–2 FTEs). |
| Materials Scientist | 1 | [#15] Materials scientist for chair/metal analysis and corrosion testing. |
| Field Researcher / Xenobiologist | 1 | [#15] Xenobiologist/field researcher for sampling and environmental studies. |
| Psychiatrist / Medical Officer | 1 | [#14, #15] Psychiatrist/medical officer for monitoring cognitive effects and medical follow-up. |
| Containment Engineer | 1 | [#6, #7] Engineer for containment modifications, HVAC/filtration and maintenance oversight. |
| Translation / Liaison Staff | 1 | [#27] French-speaking liaison for local dealings and contractor management. |
Confidence Notes
Analyst notes provide detailed line items and ranges, allowing an informed mid-range estimate; significant uncertainty remains around purchase vs lease, in-house vs outsourced analytics, and contingent advanced research costs, so confidence is medium.