SCP-1414
Safe
~
medium confidence
SCP-1414
Expected annual
$213K
One-time setup
$246K
Annual recurring
$207K
Personnel
5
One-time setup is approximately $246,025 driven by room construction, test instrumentation, and a contingency reserve; recurring annual costs are about $207,250 driven primarily by staff wages, security, and administrative overhead.
One-Time Capital Costs
Total: $246K
Annual Recurring Costs
Total: $207K/yr
Cost Scenarios
📊
Baseline
(baseline)
$207K/yr
Normal year with scheduled testing, routine maintenance, and no containment incidents.
regular_testing
no_incidents
routine_maintenance
🚨
Minor Incident
$232K/yr
Accidental exposure or unauthorized volume increase causing limited medical treatment, counseling, short downtime, and minor equipment repairs.
unauthorized_volume_increase
test_accident
limited_medical_response
🚨
Major Breach
$327K/yr
Significant containment failure or public exposure requiring extended medical/legal response, PR, equipment upgrade, and possible compensation.
public_exposure
long-term_deafness_claims
regulatory_investigation
🚨
Research Breakthrough Requiring Scale Up
$357K/yr
Discovery of additional anomalous behaviors or research breakthroughs that necessitate substantial containment upgrades and expanded testing programs.
new_anomalous_properties
expanded_research
containment_upgrade
Personnel
5 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 2 | [#11] Two Level-2 guards (shared across site) to provide controlled access and on-call support. |
| Research Scientist | 1 | [#10] Trained researcher leading experimental protocols (0.2–0.5 FTE aggregated to one part-time researcher; salary included in staff_wages). |
| Containment Technician | 1 | [#10] Containment technician to manage authorized tests and daily checks (0.1–0.2 FTE aggregated to one part-time tech; salary included in staff_wages). |
| Administrative Staff / Project Lead | 1 | [#10, #15] Project lead/administrative oversight for SOPs, scheduling, and liaison with legal (0.1–0.2 FTE; salary included in staff_wages). |
Confidence Notes
Estimates are based on analyst-provided ranges and standard site cost heuristics; line items and ranges are well-specified but many items (contingency, staff FTE mix, overhead) introduce moderate uncertainty.