SCP-1479
Euclid
~
medium confidence
SCP-1479
Expected annual
$5.3M
One-time setup
$14.4M
Annual recurring
$5.1M
Personnel
30
Initial capital/setup costs are approximately $14.4M driven by site acquisition/retrofit and BSL-3 lab buildout; ongoing annual operations are about $5.14M driven by payroll, contingency reserve, and steady lab/monitoring costs.
One-Time Capital Costs
Total: $14.4M
Annual Recurring Costs
Total: $5.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.1M/yr
Normal year with no major incidents; routine research and operations continue.
routine_operations
no_breach
normal_research_activity
🚨
Minor Incident
$5.3M/yr
Localized containment incident or medical event requiring limited MTF response, repairs, and extra lab assays.
localized_breach
medical_evacuations
targeted_decontamination
🚨
Major Breach
$7.6M/yr
Significant containment failure requiring extended MTF deployment, large-scale specimen removal, emergency external labs and facility repairs.
major_containment_failure
extended_MTF_deployment
external_lab_rental
🚨
Political Exposure
$10.1M/yr
Public/political exposure requiring large-scale legal/PR response, potential relocation or major cover-up operations.
public_disclosure
local_investigation
legal_challenges
Personnel
30 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#5] Minimum on-site armed guard coverage (4 per 12-hour shift) as budgeted. |
| Research Scientist | 6 | [#12] Ecologists, botanists, wildlife biologists and senior scientific staff. |
| Laboratory Technician / Veterinary Technician | 4 | [#12] Lab techs and veterinarian support for specimen handling and assays. |
| Engineer / Maintenance | 4 | [#13] HVAC/filtration techs, electricians and general engineers for site upkeep. |
| Site IT / Administrative Staff | 2 | [#13, #17] IT, data management and administrative support. |
| Janitorial / Facilities Support | 4 | [#13] Janitorial and facilities maintenance staff. |
| Medical Officer / Paramedic | 1 | [#14] On-site medical support/paramedic for immediate response. |
| Site Director / Executive Staff | 1 | [#13] Small management team / site director representative. |
Confidence Notes
Analyst notes provide detailed line items and realistic ranges, producing a well-constrained budget. Residual uncertainty remains due to the anomalous biological unknowns and range estimates for several capital items, so confidence is medium.