SCP-1487
Euclid
✓
high confidence
SCP-1487
Expected annual
$1.4M
One-time setup
$1.1M
Annual recurring
$1.4M
Personnel
9
Initial capital/setup costs are approximately $1.15M, driven by containment construction and contingency reserves; ongoing annual operations are approximately $1.40M/year, dominated by personnel and research costs.
One-Time Capital Costs
Total: $1.1M
Annual Recurring Costs
Total: $1.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.4M/yr
Ordinary year with routine testing, weekly interviews, scheduled maintenance, and no containment incidents.
routine_testing
no_incidents
🚨
Minor Incident
$1.6M/yr
Localized containment incident (restraint/CCTV/suit failure) requiring emergency response, short-term medical care, repairs, and additional legal/amnestic actions.
restraint_failure
temporary_exposure
equipment_malfunction
🚨
Major Breach
$2.4M/yr
Sustained containment breach or subject-assisted exposure leading to large recovery operation, public exposure mitigation, extended legal/amnestic operations, and potential relocation.
sustained_breach
public_exposure
subject_escape
Personnel
9 total
| Role | Count | Notes |
|---|---|---|
| Lead Researcher (Level-4) | 1 | [#6] Lead researcher responsible for weekly interviews and program oversight. |
| Research Scientist (Level-3) | 2 | [#6] Two Level-3 researchers to supervise testing and experiments. |
| Security Officer / MTF Agent | 2 | [#7] Minimum two full-time guards for transfers, checks and rapid response. |
| Medical Officer | 1 | [#8] Part-time physician/orthopedist coverage and consults. |
| Medical Technician / Nurse | 1 | [#8] Nurse/med tech for on-site medical support and administration of sedatives. |
| Psychologist / Counselor | 1 | [#9] Child psychologist for weekly interviews and counseling. |
| Tutor / Welfare Staff | 1 | [#9] Private tutor and welfare support for adolescent detainee. |
Confidence Notes
Analyst notes provide detailed line-item ranges for nearly all cost drivers (infrastructure, personnel, equipment and contingency), enabling a high-confidence order-of-magnitude estimate; large low-probability contingencies remain uncertain.