SCP-1523
Safe
✓
high confidence
SCP-1523
Expected annual
$486K
One-time setup
$280K
Annual recurring
$482K
Personnel
5
Initial one-time setup is moderate (tens to low hundreds of thousands) for a sealed burn chamber, HVAC isolation and instrumentation; main recurring costs are personnel, medical monitoring, filter replacement, and ongoing experimental funding with contingency reserves for large remediation events.
One-Time Capital Costs
Total: $280K
Annual Recurring Costs
Total: $482K/yr
Cost Scenarios
📊
Baseline
(baseline)
$482K/yr
Normal year with scheduled testing, maintenance, and no containment incidents.
scheduled tests
routine maintenance
no leaks or exposures
🚨
Minor Incident
$492K/yr
Small smoke leak or minor in-chamber containment issue requiring localized cleanup and limited medical follow-up.
minor smoke leak
localized remediation
1-2 staff precautionary tests
🚨
Major Breach
$632K/yr
Moderate contamination of adjacent rooms or testing area requiring substantial remediation and medical treatment.
chamber failure
HVAC bypass
multiple staff exposures
🚨
Catastrophic Contamination
$1.5M/yr
Site-wide contamination requiring full remediation, major HVAC replacement, extended shutdowns and extensive medical/legal costs.
smoke propagation into site air
HVAC system failure
widespread staff exposure
🚨
Legal Exposure
$682K/yr
Public or legal exposure of the object's voice/identity requiring extensive legal, PR, and cover operations.
public leak
family or rights-holder legal action
media attention
Personnel
5 total
| Role | Count | Notes |
|---|---|---|
| Containment Technician | 2 | Two technicians minimum during tests; handles ignition, monitoring, extinguishing and routine storage checks. Salaries included in staff_wages. |
| Research Scientist | 1 | Leads experimental protocol, data collection and analysis; salary included in staff_wages. |
| Safety Officer | 1 | On-call safety officer for tests and emergency coordination; salary included in staff_wages. |
| Administrative Staff / Site Manager | 1 | Pro-rated site/security/managerial overhead and administration included in staff_wages. |
Confidence Notes
Analyst notes give detailed line items and ranges for virtually all cost categories; SCP is Safe and low-footprint, so budget estimates are based on concrete equipment/labor figures and standard containment practices.