SCP-1540
Euclid
~
medium confidence
SCP-1540
Expected annual
$811K
One-time setup
$446K
Annual recurring
$803K
Personnel
4.85
Initial one-time containment upgrades and BSL-3 modifications (~$446.5k) dominate capital expenditure; recurring annual costs (~$803k/yr) are driven by personnel wages, site overhead, and ongoing analyses/consumables.
One-Time Capital Costs
Total: $446K
Annual Recurring Costs
Total: $803K/yr
Cost Scenarios
📊
Baseline
(baseline)
$803K/yr
Normal year with monthly 1540-A events contained and standard monitoring/research activity; no major incidents or breaches.
routine_monthly_events
scheduled_analyses
no_contamination_incident
🚨
Minor Incident
$828K/yr
Localized contamination or equipment failure requiring emergency decontamination, extra outsourced analyses, temporary cell refurbishment, and overtime.
contaminated_cell_cleanup
equipment_failure
extra_outsourced_testing
🚨
Major Breach
$1.1M/yr
Significant containment breach or unexpected dispersal requiring emergency mobilization, temporary relocation, major repairs/rebuild, legal/PR containment measures, and extended investigations.
containment_breach
major_equipment_failure
external_exposure_event
Personnel
4.85 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist (Level-3 Researcher) | 0.75 | [#5] Fractional FTE assigned to oversight, interviews, and protocol decisions. |
| Research Technician / Lab Tech (Level-2) | 1.5 | [#6] Combined FTE for 1–2 technicians performing daily checks, sample handling, and routine analyses. |
| Security Officer / MTF Agent | 2.0 | [#7] Two dedicated on-site guards (minimum continuous coverage / overlapping shifts). |
| Physician (fractional) | 0.15 | [#8] Fractional physician FTE for on-call support and periodic checks. |
| Nurse (fractional) | 0.25 | [#8] Fractional nurse FTE for routine monitoring and immediate care. |
| Psychological / Behavioral Specialist | 0.2 | [#9] Fractional FTE to craft cover story, conduct interviews, and assess psychological state. |
Confidence Notes
Analyst notes provide detailed line items and ranges but contain several wide ranges and assumptions (FTE fractions, research scope, site-overhead allocation). Midpoint estimates used for budgeting introduce moderate uncertainty.