SCP-1624
Euclid
~
medium confidence
SCP-1624
Expected annual
$5.8M
One-time setup
$6.8M
Annual recurring
$5.5M
Personnel
23
Initial capital and contingency expenditures are in the low millions (≈ $6.8M one-time), while steady-state containment, monitoring, research, and medical/legal support drive recurring costs of roughly $5.47M/yr; major drivers are staff wages, research/monitoring programs, legal/cover operations, and contingency reserves.
One-Time Capital Costs
Total: $6.8M
Annual Recurring Costs
Total: $5.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.5M/yr
Normal year with routine monitoring, research, and containment activity; no major incidents.
routine monitoring
steady caseload
no major takedowns
🚨
Minor Incident
$6.3M/yr
Localized spread or discovery of a high-traffic mirror requiring emergency takedown, extra legal/PR action, targeted settlements, and increased clinical care.
new high-traffic mirror
small cluster of civilian exposures
emergency takedown deployment
🚨
Major Breach
$9.0M/yr
Widespread public exposure requiring multiple international takedowns, large-scale legal/settlement costs, and use of emergency reserves.
international mirror proliferation
mass public exposure
multi-jurisdiction legal actions
🚨
Bsl Upgrade Required
$8.2M/yr
Real parasitic organisms implicated, triggering capital BSL retrofit and increased recurring BSL operations.
discovery of live parasitic agents
cross-contamination risk
regulatory decision to upgrade containment
Personnel
23 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 11 | [#2] 8–12 guards plus 1 supervisor for 24/7 coverage at Site-77; headcount chosen as 10 guards + 1 supervisor (11 total). |
| Cybersecurity Engineer / Analyst | 5 | [#1] Dedicated cyber containment team: 1senior engineer, 2 cyber analysts, 1 sysadmin, 1 incident response operator. |
| Research Scientist | 3 | [#13] 2–4 researchers budgeted; midpoint staffing chosen to match research salary portion included in staff_wages. |
| Incident Response / Field Agent | 4 | [#16] Small rapid takedown/field operations team retained on-call (retainer accounted for in staff_wages). |
Confidence Notes
Analyst notes provide detailed line items and ranges, enabling a reasonable mid-range estimate; however wide ranges for clinical caseloads, international legal difficulty, and potential BSL upgrades create significant uncertainty.