SCP-1633
Safe
~
medium confidence
SCP-1633
Expected annual
$916K
One-time setup
$462K
Annual recurring
$898K
Personnel
6
First-year one-time capital and setup costs are approximately $462,500, driven by lab construction, destruction equipment, and legal/contingency reserves. Ongoing annual costs are about $898,000, dominated by personnel (research, IT/forensics, security), consumable hardware replacement, and long-term research/monitoring.
One-Time Capital Costs
Total: $462K
Annual Recurring Costs
Total: $898K/yr
Cost Scenarios
📊
Baseline
(baseline)
$898K/yr
Normal uneventful year with planned testing cadence, routine personnel costs, consumables replacement, audits, and research funding.
scheduled_tests
routine_replacements
annual_audit
🚨
Minor Incident
$923K/yr
Localized adverse event (tester seizure/medical incident, single workstation catastrophic failure, small legal/PR response) requiring emergency response, repairs and one-off legal/medical expenses.
tester_medical_event
single_equipment_loss
minor_legal_or_pr_response
🚨
Major Breach
$1.6M/yr
Significant containment/operational failure resulting in public exposure or major litigation, extended investigations, large settlements, major equipment and staffing replacements, and PR/legal campaigns.
public_exposure
mass_staff_injury
major_legal_litigation
Personnel
6 total
| Role | Count | Notes |
|---|---|---|
| IT/Forensic Analyst | 2 | [#8] Secure-ops and forensic analysts preparing machines, monitoring runs, wiping drives and maintaining chain-of-custody. |
| Research Scientist / Game Analyst | 2 | [#9] Game analysts and AI researchers studying heuristics, designing safe protocols and producing containment documentation. |
| Security Officer / MTF Agent | 2 | [#10] Guards assigned to storage locker and supervision of test sessions. |
Confidence Notes
Analyst notes provide detailed categorical ranges, but many items (legal settlements, frequency of destructive tests, choice to buy vs outsource destruction equipment) have wide ranges and are scenario-dependent, so estimates use midpoint assumptions and a conservative staffing baseline.