SCP-1641
Euclid
~
medium confidence
SCP-1641
Expected annual
$956K
One-time setup
$1.9M
Annual recurring
$943K
Personnel
9
Estimated one-time capital/setup costs of $1,860,000 driven by blast-rated containment, chambers, vivaria, furnace and safety systems; recurring annual costs of $943,000 driven primarily by staff wages, hazardous-metal feedstock/consumables, hazardous-waste disposal, and institutional overhead.
One-Time Capital Costs
Total: $1.9M
Annual Recurring Costs
Total: $943K/yr
Cost Scenarios
📊
Baseline
(baseline)
$943K/yr
Normal year with no major incidents; routine operations and scheduled maintenance only.
no incidents
routine breeding throughput
scheduled maintenance
🚨
Minor Incident
$993K/yr
Small thermite/fire event or localized contamination requiring cleanup, overtime and equipment repair.
localized thermite reaction containment breach
small-scale fire or particulate release
overtime and emergency consumables
🚨
Major Breach
$1.3M/yr
Significant containment breach requiring replacement of chambers/vivariums, extensive cleanup, regulatory/legal response and temporary relocation.
chamber failure during mating thermite event
extensive contamination of facility
major hazardous-waste disposal and legal costs
🚨
Catastrophic Breach
$3.4M/yr
Catastrophic event (large uncontrolled fire/structural loss) requiring facility rebuild, prolonged shutdown and significant legal/insurance consequences.
uncontrolled thermite fire
structural loss of containment bunker
major public exposure or multi-agency response
Personnel
9 total
| Role | Count | Notes |
|---|---|---|
| Lead Lepidopterist / Principal Biologist | 1 | [#15] Senior scientist to manage husbandry and research (item 15). |
| Containment Technician | 2 | [#16] Full-time technicians for feeding, cleaning, melting and daily husbandry (item 16). |
| Security Officer / MTF Agent | 4 | [#17] Dedicated on-site security staffing to cover 24/7 (item 17). |
| EHS / Fire-Safety Specialist | 1 | [#18] Environmental health and safety specialist for compliance and suppression maintenance (item 18). |
| Project Director / Administrative Staff | 1 | [#19] Project director and administrative allocation (item 19). |
Confidence Notes
Analyst notes provide itemized estimates and a clear baseline; however many costs (incident probabilities, metal consumption at scale, insurance and legal exposure, and whether services are contracted or purchased) have wide ranges, so figures are best viewed as order-of-magnitude estimates.