SCP-1669
Euclid
~
medium confidence
SCP-1669
Expected annual
$1.5M
One-time setup
$1.4M
Annual recurring
$1.5M
Personnel
13
First-year one-time capital/setup costs are approximately $1.44M driven by specialized cell construction, cryogenic freezers, autopsy bay and contingency reserves; annual recurring operations average about $1.45M/year driven primarily by security and medical staffing, autopsy/consumables, and contingency replenishment.
One-Time Capital Costs
Total: $1.4M
Annual Recurring Costs
Total: $1.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.5M/yr
Normal uneventful year with routine operations, scheduled autopsies and no major containment incidents.
scheduled 1669-Alpha events handled without major damage
no large equipment failures
no legal/public exposures
🚨
Minor Incident
$1.6M/yr
One moderately damaging Alpha event causing localized equipment damage, overtime and an extra autopsy or two.
localized facility repairs
increased overtime
additional autopsy(s)
🚨
Major Incident
$2.2M/yr
Significant breach or violent event causing equipment destruction (freezers, cameras), multiple casualties, and use of contingency funds.
armored breach or heavy-weapon use
multiple equipment replacements
large emergency medical/legal response
🚨
Catastrophic Breach
$4.0M/yr
Severe catastrophic event with widespread site damage, major casualties, legal exposure, and site-level remediation/decommissioning costs.
site-level destruction
mass casualties and public exposure
full decommissioning or major remediation
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 9 | [#3] 6–8 full-time guards + 2 supervisors averaged to ~9 security personnel to cover 24/7 shifts (costs included in staff_wages). |
| Medical Officer | 3 | [#6] On-site clinician plus pathology/forensic technicians (salaries and on-call premiums included in staff_wages). |
| Administrative Staff | 1 | [#23] Partial FTE(s) for procurement, scheduling and records allocated (represented in staff_wages estimate). |
Confidence Notes
Analyst notes provide detailed line items and ranges, allowing a reasonable mid-point estimate, but several items have wide ranges (incident reserves, staffing levels, frequency of events) which lowers certainty to medium.