SCP-168
Safe
✓
high confidence
SCP-168
Expected annual
$586K
One-time setup
$606K
Annual recurring
$578K
Personnel
2.63
One-time capital (including a conditional containment upgrade) totals approximately $606,050; annual recurring costs are dominated by staffing, legal/cover, IT/research support and conditional upgraded security, totaling $578,350/yr.
One-Time Capital Costs
Total: $606K
Annual Recurring Costs
Total: $578K/yr
Cost Scenarios
📊
Baseline
(baseline)
$578K/yr
Normal uneventful year with standard monitoring, staffing, legal/IT retainer and conditional security provisioning included in the baseline totals.
routine_operations
scheduled_research
no_incidents
🚨
Minor Incident
$598K/yr
Small containment or equipment incident requiring repairs, short-term overtime, limited PR/legal support and equipment replacement.
temporary_breach
equipment_damage
limited_personnel_exposure
🚨
Major Breach
$758K/yr
Significant containment failure or extended unauthorized activity requiring emergency containment mobilization, after-action remediation and legal/medical response.
extended_breach
unexpected_mobility
personnel_injury_or_exposure
🚨
Euclid Upgrade
$1.1M/yr
Petition accepted to upgrade SCP-168 to Euclid and implementation of hardened containment chamber and stricter protocols.
reclassification
containment_upgrade
regulatory_or_research_escalation
Personnel
2.63 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist (Level-2) | 1 | [#10] Primary assigned researcher, daily contact and research lead. |
| Technician / Level-1 (FTE) | 0.5 | [#10] Part-time/shared technician for daily checks and equipment maintenance (0.5 FTE). |
| Security Officer / MTF Agent (pro-rated) | 0.9 | [#11] Pro-rated security allocation for locked-room enforcement and escorts (shared coverage). |
| Administrative Staff / Data Analyst (part-time) | 0.23 | [#15] Part-time admin analyst for transcription, redaction, and log maintenance. |
Confidence Notes
Analyst notes provide detailed line-item estimates (salaries, equipment, recurring services) and pro-rated allocations; most costs are routine and derived from concrete assumptions. Larger conditional items (containment upgrade range) introduce uncertainty but are explicitly modeled.