SCP-167
Safe
~
medium confidence
SCP-167
Expected annual
$1.6M
One-time setup
$1.2M
Annual recurring
$1.6M
Personnel
14
One-time startup costs (equipment, initial research setup, contingency reserves) are estimated at $1,229,200; recurring annual costs (staff wages, research, maintenance, overhead) are estimated at $1,413,125/year, driven mainly by personnel and research/monitoring budgets.
One-Time Capital Costs
Total: $1.2M
Annual Recurring Costs
Total: $1.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.6M/yr
Normal year with routine exploration missions, regular maintenance, and no major incidents or discoveries requiring new containment.
scheduled_research_missions
routine_maintenance
no_major_finds
🚨
Minor Incident
$1.5M/yr
Minor on-site incident: entrapment/rescue, medical response, equipment repair and small-scale remediation.
researcher_entrapment
limited_structural_repair
emergency_medical_evacs
🚨
Major Discovery Of Secondary Scp
$2.1M/yr
Discovery of a secondary anomalous object inside SCP-167 requiring dedicated Euclid-class containment construction and initial operations.
recovery_of_euclid_class_object
need_for_new_containment
external_contractors_required
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Containment Specialist / Research Lead | 1 | [#5] Senior level-3 containment lead for SCP-167 operations and mission approvals. |
| Containment Technician | 2 | [#5] Field techs for exploration, tethering, and marking protocols. |
| Archaeologist / Anthropologist | 1 | [#5, #14, #15] Specialist for artifact context, conservation triage and sampling decisions. |
| Technician (recording/mapping) | 1 | [#5, #9, #16] Operator for mapping hardware, SLAM/LIDAR, and data capture. |
| Security Officer / Guard | 2 | [#6] On-site guards to enforce access control and rapid response. |
| Medical Officer / Med Tech | 1 | [#7] On-call or dedicated med tech coverage for exploration missions. |
| Research Scientist | 2 | [#17] Dedicated researchers analyzing anomalous items and mapping data. |
| Conservator | 1 | [#14] Artifact treatment, stabilization and storage planning. |
| Curator / Cataloger | 1 | [#16] Cataloging, database maintenance and archival duties. |
| Engineer / Maintenance | 1 | [#4, #11] Equipment upkeep (UPS/generator, robotics support) and facility systems maintenance. |
| Administrative Staff | 1 | [#16, #26] Budget/admin, auditing, and records/chain-of-custody management. |
Confidence Notes
Estimates draw from analyst note ranges and a modest program posture; major uncertainties include the discovery of secondary SCPs (very high-cost, low-probability) and long-term scaling choices, so numerical estimates are approximate but grounded in the provided ranges.