SCP-1685
Safe
?
low confidence
SCP-1685
Expected annual
$15.7M
One-time setup
$45.9M
Annual recurring
$15.4M
Personnel
70
Estimated one-time program setup for a 20-instance program is approximately $42.8M driven mainly by pressure-suit procurement, airlock construction, and instrumentation; recurring annual costs are approximately $15.4M driven by staff wages (MTF and research), site security, and program overhead.
One-Time Capital Costs
Total: $45.9M
Annual Recurring Costs
Total: $15.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$15.4M/yr
Normal year with steady containment, routine maintenance, research, and no major incidents.
no_incidents
routine_operations
scheduled_maintenance
🚨
Minor Incident
$17.4M/yr
Localized incident requiring emergency response, temporary repairs, legal/compensation payouts, and MTF surge operations.
small_vent_or_leak
public_exposure_risk
localized_airlock_repair
🚨
Major Breach
$25.4M/yr
Catastrophic containment failure at one or more sites requiring full rebuild, large legal settlements, broad emergency operations and increased MTF/R&D response.
catastrophic_venting
multi-site_failure
major_public_casualties_or_damage
Personnel
70 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 10 | [#13] Central astrophysicists/materials/optical engineers and analysts supporting Project Heimdall and SCP-1685 research. |
| Security Officer / MTF Agent | 40 | [#14, #15] Mobile Task Force Pi-4 standing personnel and 24/7 local security staffing across 20 sites (~2 guards/site included in headcount). |
| Engineer / Maintenance | 8 | [#3, #4, #16, #20] Engineers and technicians for airlock maintenance, generator upkeep, and site integration. |
| Technician (data/robotics) | 5 | [#8, #9, #11, #10] Telescope, telemetry, robotics operators and data-handling technicians. |
| Administrative Staff / Program Managers | 5 | [#22] Program management, administrative, audit/compliance staff. |
| Medical Officer | 2 | [#7] Medical support for suit operations and emergency response. |
Confidence Notes
Estimates are order-of-magnitude based on analyst ranges and assume a 20-instance program; significant uncertainty in instance count, suit pricing, incident frequency, and required robotics/non-destructive testing capacity leads to low confidence.