SCP-1689
Safe
~
medium confidence
SCP-1689
Expected annual
$1.2M
One-time setup
$9.2M
Annual recurring
$1.1M
Personnel
2
Initial capital is dominated by optional large projects (mobile-site and industrial biomass processing), while baseline containment and modest exploration require moderate one-time equipment/lab setup (~$1M) and recurring costs around $1.13M/yr driven by research, monitoring, and staff wages.
One-Time Capital Costs
Total: $9.2M
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal year with routine monitoring, periodic small-scale expeditions, and no major incidents or activation of large programs.
routine_operations
periodic_expeditions
🚨
Minor Incident
$1.2M/yr
Localized containment issue: pest infestation, small contamination event, or failed small expedition requiring cleanup and limited remediation.
pest_infestation
limited_spill_or_contamination
failed_expedition_recovery
🚨
Mobile Site Activation
$4.4M/yr
Approval and initial deployment of a mobile site/habitat inside SCP-1689-A, incurring prototype capital and increased ops.
approval_for_mobile_site
large-scale_expedition_and_deployment
🚨
Large Scale Biomass Processing
$6.5M/yr
Uncontrolled interior expansion or sustained high-rate removal forces Foundation to build/install industrial biomass processing/disposal infrastructure.
uncontrolled_interior_expansion
continuous_mass_removal_requirements
Personnel
2 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Custodian | 1 | [#4] Level-3 assigned custodian/researcher responsible for daily checks, access control, and expedition liaison. |
| Security Officer / MTF Agent | 1 | [#5] Rotating security coverage for access control and transfer operations (1 FTE equivalent). |
Confidence Notes
Analyst notes are detailed with ranges for most items and clear drivers; however large optional projects (mobile site, industrial processing) and usage-dependent recurring items create substantial variance, so overall confidence is medium.