SCP-1704
Euclid-numen
~
medium confidence
SCP-1704
Expected annual
$2.7M
One-time setup
$2.2M
Annual recurring
$2.6M
Personnel
14
First-year capital (one-time) costs are approximately $2.19M driven by containment construction, specialized equipment, and a large remediation contingency; steady-state annual operating costs are about $2.64M driven primarily by staff wages, research program funding, and legal/cover-up budgets.
One-Time Capital Costs
Total: $2.2M
Annual Recurring Costs
Total: $2.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.6M/yr
Normal uneventful year with regular operations, research activity at the chosen steady-state level, and no major incidents.
steady-state research schedule
no breaches or major incidents
🚨
Minor Incident
$2.8M/yr
Small containment incident or localized equipment failure requiring overtime, short repairs, limited investigation and PR/legal engagement.
equipment failure (HVAC/generator/monitoring)
localized breach or staff exposure
🚨
Major Breach
$4.1M/yr
Significant containment breach or public exposure requiring major remediation, large-scale investigations, legal action, and potential temporary relocation of assets.
security breach
public exposure/remanifestation observed publicly
🚨
Research Breakthrough Requiring Scale Up
$3.2M/yr
Project Orpheus-30 generates a promising lead that requires rapid expansion of research resources, additional experiments, and temporary increases in staff and equipment.
major experimental result
approval for expanded trials
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#7] Minimum practical staffing: 2guards per shift x 3 shifts = 6 posted security personnel. |
| Level-4 Containment Scientist | 2 | [#8] Dedicated Level-4+ containment scientists (1–2); two assumed for robust coverage and Project Orpheus-30 liaison. |
| Research Scientist / Technician | 3 | [#8] Research scientists/technicians (2–4) covering osteology, linguistics, audio analysis; midpoint chosen. |
| Psychologist | 1 | [#8] 0.5–1 FTE psychologist; one FTE assumed for counseling and study. |
| Engineer / Maintenance (Facilities Technician) | 1 | [#8] One facilities technician for HVAC, filtration, and equipment maintenance. |
| Administrative Staff | 1 | [#27] Administrative support for access control, records, and clearance management. |
Confidence Notes
Analyst notes provide detailed line items and ranges for nearly every cost, enabling reasonable mid-point estimates; uncertainty remains in large ranges for research (Project Orpheus-30) and the long-term remediation contingency, so confidence is medium.