SCP-1775
Euclid
~
medium confidence
SCP-1775
Expected annual
$1.2M
One-time setup
$1.3M
Annual recurring
$1.2M
Personnel
11
One-time setup and site-control costs are large (property acquisition, remediation, stabilization, and contingency demolition) while recurring staff wages (security + research) and an active research/monitoring program are the primary annual drivers.
One-Time Capital Costs
Total: $1.3M
Annual Recurring Costs
Total: $1.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.2M/yr
Normal year with steady operations, no major incidents; recurring monitoring, staffing, and upkeep only.
no incidents
regular monitoring
routine maintenance
🚨
Minor Incident
$1.2M/yr
Occasional anomalous deviation or small incident requiring forensic analysis, short response deployment, minor repairs and limited PR/legal action.
SCP-1775-X behavioral deviation
video forensic & consultant engagement
short MTF response / sensor repair
🚨
Major Breach
$1.9M/yr
Significant containment failure or public exposure requiring demolition/neutralization, large remediation, extended legal/PR response and major repairs.
uncontained anomalous escalation
major public exposure
decision to demolish/neutralize
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#5] Six full-time perimeter guards to provide 24/7 coverage. |
| Security Supervisor / Manager | 1 | [#5] On-site security manager/supervisor for scheduling and escalation. |
| Research Scientist | 1 | [#6] Head researcher / PI responsible for monitoring and reporting. |
| Research Assistant | 2 | [#6] Two research assistants for daytime monitoring and data collection. |
| Engineer / Maintenance (Site Technician) | 1 | [#6, #9] One site technician for sensors, equipment maintenance, and structural access support. |
Confidence Notes
Estimates are built from analyst midpoints and detailed line items in the notes (medium confidence). Significant uncertainties remain around demolition likelihood, exact staffing/benefit rates, and variability in municipal costs, so point estimates use conservative mid-range assumptions.