SCP-1779
Euclid
~
medium confidence
SCP-1779
Expected annual
$1.5M
One-time setup
$118K
Annual recurring
$1.5M
Personnel
14
One-time capital and equipment for secure enclosures and monitoring are modest (~$117.5k), while ongoing annual costs are dominated by staff wages, site overhead and contingency (~$1.50M/yr). Primary recurring drivers are security and research staffing, facility overhead, and field/logistics operations.
One-Time Capital Costs
Total: $118K
Annual Recurring Costs
Total: $1.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.5M/yr
Normal operational year with routine research, husbandry and field activity but no major incidents.
routine feeding and maintenance
scheduled research and field ops
🚨
Minor Incident
$1.6M/yr
Limited theft attempt, small escape or localized contamination event requiring emergency response, temporary repairs, overtime, small legal/compensation payouts and additional veterinary/necropsy work.
attempted hoard theft
minor escape or localized breach
small remediation/compensation
🚨
Major Breach
$2.3M/yr
Significant containment breach or large-scale incident (multiple specimen losses, major remediation, public exposure) requiring major upgrades, legal settlements, mass remediation and replacement capital.
large escape or coordinated theft
widespread contamination or property damage
major public exposure/legal action
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#10] 24/7 coverage with rotating shifts; estimate uses 6 guards (midpoint of 4–8). |
| Research Scientist | 3 | [#12] Principal Investigator (Level 4) plus ~2 researchers. |
| Research Technician / Animal Handler | 3 | [#12] 2–3 lab techs and specimen handlers for husbandry and experimental work. |
| Administrative Staff | 1 | [#23] Recordkeeping, inventory control and audits; administrative support. |
| Site Director / Executive Staff | 1 | [#9, #10] Oversight and liaison with site-level operations and security. |
Confidence Notes
Analyst notes are detailed and enumerate most cost drivers, but many line items are given as wide ranges and several annual frequencies (e.g., clutch events, field ops) require assumptions (assumed a ~10-specimen small program); this produces moderate uncertainty.