SCP-1786
Safe
~
medium confidence
SCP-1786
Expected annual
$2.6M
One-time setup
$11.1M
Annual recurring
$2.6M
Personnel
14
Initial capital expenditure is approximately $11.1M driven by construction of specialized containment and multiple contingency/neutralization options; recurring annual operations are approximately $2.59M/year driven by staff wages, R&D, security and administrative overhead.
One-Time Capital Costs
Total: $11.1M
Annual Recurring Costs
Total: $2.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.6M/yr
Normal year with no major incidents; routine operations, R&D and scheduled maintenance only.
normal_operations
scheduled_maintenance
🚨
Minor Incident
$2.7M/yr
Localized humidity excursion or equipment failure requiring overtime, extra disposals, temporary repairs and contractor support.
humidity_excursion
sensor_failure
short_power_outage
🚨
Major Breach
$3.4M/yr
Prolonged containment failure with significant coffee release requiring incident response, community monitoring and partial use of contingency funds.
prolonged_power_loss
containment_breach
🚨
Catastrophic Breach
$9.6M/yr
Uncontrolled exposure leading toward large-scale water-to-coffee conversion requiring neutralization, extensive remediation, and strategic-level response.
uncontrolled_exposure
mass_conversion_of_water
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Site Director / Executive Staff | 1 | [#7] Senior site director position included in core staffing. |
| Security Officer / MTF Agent | 5 | [#8] Level-2/Level-3 security guards for 24/7 coverage (midpoint of 4–6). Costs are captured under recurring security_personnel. |
| Shift Operators | 4 | [#7] Four operators (two per shift redundancy) included in core staffing and staff_wages. |
| Research Scientist | 2 | [#7, #12, #13] On-site researchers supporting analysis and R&D; salaries included in staff_wages and research_and_monitoring budgets. |
| Engineer / Maintenance | 2 | [#7, #20] Two maintenance technicians for environmental systems and routine upkeep; costs included in staff_wages and facilities_maintenance. |
Confidence Notes
Estimates use midpoints of ranges provided in analyst notes; many line items have wide ranges (especially major capital contingencies and multi-year R&D), and the unknown anomalous power source introduces risk/uncertainty in required mitigations.