SCP-1814
Euclid
~
medium confidence
SCP-1814
Expected annual
$2.1M
One-time setup
$4.0M
Annual recurring
$2.1M
Personnel
23
Estimated one-time capital and build costs are substantial (~$4.04M) driven by a custom vacuum-rated containment cell, filtration/exhaust systems, robotics, redundancy and large breach reserves; recurring annual costs are dominated by staffing, medical/research programs, maintenance and secrecy/legal budgets (~$2.06M/yr).
One-Time Capital Costs
Total: $4.0M
Annual Recurring Costs
Total: $2.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.1M/yr
Normal year with no major incidents; routine maintenance, staff wages, research and regular consumables only.
routine_operations
scheduled_tests
no breaches
🚨
Minor Incident
$2.3M/yr
Small oxygenation event or microcrack leading to limited interior contamination, emergency venting, short-term medical treatment and localized repairs.
microcrack_detection_failure
small_oxygenation_event
🚨
Major Breach
$3.6M/yr
Catastrophic containment failure requiring box replacement, large-scale remediation, multiple casualties, legal exposure and significant public-area cleanup.
catastrophic_box_failure
public_exposure
major_medical_liability
Personnel
23 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | 24/7 on-site guards dedicated to SCP-1814 (matches #16 staffing estimate of 4–8 guards). |
| Medical Officer | 2 | On-call medical staff and ICU-trained personnel for immediate triage and pathology (#14). |
| Research Scientist | 3 | Researchers for pulmonary/pathogen studies, instrumentation, and experiments (#17, #18, #28). |
| Engineer / Maintenance | 2 | Engineers for vacuum systems, HVAC, pumps and robotic maintenance (#2, #4, #25). |
| Forensic / Investigative Staff | 2 | Personnel to investigate oxygenation events and recommend fixes (#27). |
| Psychologist | 1 | Part-time psychologist for pre-entry screening and evaluations (#15). |
| Administrative Staff | 1 | Site/admin coordination, records, and liaison duties (administrative overhead #30). |
| Class-D Personnel | 6 | On-site pool of D-class subjects available for repairs/testing as needed (#13). |
Confidence Notes
Reasonable mapping from analyst ranges to point estimates; many items have wide ranges and contingent per-event costs (relocation, breaches, legal outcomes), so totals are moderately uncertain but grounded in explicit line items.