SCP-182
Euclid
~
medium confidence
SCP-182
Expected annual
$3.0M
One-time setup
$5.5M
Annual recurring
$2.9M
Personnel
15
Initial capital and contingency reserves dominate first-year costs (~$5.5M one-time), while recurring annual operations (personnel, transport, fuel, maintenance, medical) drive ongoing costs of roughly $2.91M/yr.
One-Time Capital Costs
Total: $5.5M
Annual Recurring Costs
Total: $2.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.9M/yr
Normal year with no major incidents; routine operations, maintenance, rotations and medical support only.
routine_operations
scheduled_rotations
regular_maintenance
🚨
Minor Incident
$3.1M/yr
Isolated medical/psychological breakdown or small environmental/waste spill requiring medevac, short-term replacement staff and local cleanup.
single_guard_psychotic_breakdown
small_spill_or_waste_incident
short_medical_evacuation
🚨
Major Breach
$4.9M/yr
Multiple personnel affected or significant equipment damage requiring extended medevac, legal/forensic response and substantial repairs.
multi-personnel_breakdown
major_equipment_damage
extended_cleanup_and_repair
🚨
Catastrophic Breach
$8.9M/yr
Full containment loss, major environmental contamination or destruction of primary facility necessitating rebuild, long-term remediation and large-scale legal/PR response.
complete_facility_loss
large_scale_contamination
major_public_exposure
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#8] Guard pool required to sustain 5 guards on-site continuously with rotation, sick leave and rest requirements. |
| Site Supervisor / Administrative Staff | 2 | [#9] Senior supervisor and logistics/inventory/admin roles to manage rotations, supplies and reporting. |
| Medical Officer | 1 | [#10] On-site/periodic medic capability covered in staffing costs; medevac contract is separate. |
Confidence Notes
Range-based analyst estimates provide moderate precision for major line items (construction, personnel, fuel) but Arctic logistics, medevac guarantees, and contingency sizing are uncertain, so estimates are mid-range judgements.