SCP-184 Euclid ~ medium confidence
SCP-184
Expected annual
$3.7M
One-time setup
$3.1M
Annual recurring
$3.7M
Personnel
19
One-time setup is estimated at about $3.09M driven primarily by land/fencing, electromagnet systems, vehicles and an initial reserve. Annual operating costs are estimated at ~$3.65M/yr driven by staff wages, insurance/reserves, power/cooling, legal/cover-story and ongoing R&D/monitoring.
🏗️ One-Time Capital Costs Total: $3.1M
Equipment $1.2M
[#2, #4, #6, #7, #11, #13, #15, #20, #22] High-power electromagnet procurement/installation, generator/ATS/UPS hardware, SCADA & comms initial install, CCTV/NVR and perimeter sensors, non-magnetic toolsets, visitor kiosks, materials-analysis instruments, secure IT setup, robotics fleet hardware (one-time installs).
Initial Reserve Fund $1.0M
[#19] Initial contingency/reserve fund seeded to cover catastrophic incidents and large buyouts.
Armored Transport Vehicle $400K
[#10] Armored transport / vehicle modifications and mobile magnet module for relocation operations.
Facilities $230K
[#1] Land acquisition/clearing (purchase) and perimeter fencing/gates; cleared acreage and basic perimeter works.
Initial Research And Lab Setup $100K
[#14, #15] Portable lab instrumentation and initial research lab setup for materials testing and diagnostics.
Oncall Vehicle $100K
[#9] Dedicated response vehicle(s) for rapid-response team (armored/utility) purchase/modification.
Cover Story Installation $50K
[#12] Initial landscaping, park statuary installation and signage to support cover story.
Vault Conversion $50K
[#23] Vault/storage conversion for anomalous items and secure storage space setup.
🔄 Annual Recurring Costs Total: $3.7M/yr
Staff Wages $1.5M/yr
[#8, #9, #14] Salaries for on-site security guards and supervisor, on-call rapid-response team, and scientific staff (security + response + research).
Insurance And Reserves $500K/yr
[#19] Specialized insurance premiums or annual self-insurance reserve contributions.
Long Term Rnd $500K/yr
[#26] Multi-year R&D program funding (neutralization, magnetless countermeasures, containment engineering) averaged annual budget.
Cover Story And Legal $280K/yr
[#12, #18, #25, #27] Ongoing cover-story maintenance, landscaping/PR, legal retainer and liaison/community mitigation budgets; baseline PR contingency.
Logistics And Transport $190K/yr
[#9, #10, #24] Vehicle fuel/maintenance, transport logistics, off-site staff facility allowances, shuttles and vehicle pool operations.
Demolition Retainer $150K/yr
[#16] Annual retainer(s) for demolition/HAZMAT contractors on standby; per-incident demolition costs handled in scenario contingencies.
Emergency Medical $125K/yr
[#17] On-call EMT/medic staffing, medical supplies and baseline decontamination readiness; per-incident treatment/disposal budget handled in scenarios.
Research And Monitoring $85K/yr
[#6, #14, #15, #22] Monitoring service subscriptions/operations (SCADA monitoring portion), research support, annual materials-analysis budgets and per-deployment diagnostics.
Supplies And Consumables $53K/yr
[#11, #28] Non-magnetic handling tool replacements, PPE, spare parts, small consumables and routine maintenance parts.
Incident Pr Pool $50K/yr
[#27] Standing fund for rapid PR/cover actions and citizen relocation support for small incidents; major incident spending budgeted in scenarios.
Power And Electricity $44K/yr
[#3] Continuous electricity for electromagnet and ancillary systems (baseline 50 kW example).
Training And Drills $40K/yr
[#21] Regular training, tabletop and field exercises, SOP updates and audits.
Facilities Maintenance $30K/yr
[#1] Land taxes, site upkeep, perimeter repairs and grounds maintenance for open-air containment site.
Magnet Cooling And Cryogenics $30K/yr
[#5] Ongoing cooling/cryogen fills or active-water cooling maintenance depending on magnet technology.
Perimeter Surveillance Ops $30K/yr
[#7] Ongoing CCTV storage, operator staffing, sensor monitoring and periodic drone patrol operations.
Records And Data Operations $30K/yr
[#20] Secure IT operations, data storage, redaction/expungement support and archive maintenance.
Backup Fuel And Generator Maintenance $20K/yr
[#4] Fuel contracts, generator maintenance and UPS servicing.
Visitor Screening $20K/yr
[#13] Administration, background checks, visitor processing and kiosk operations.
Robotics Maintenance $10K/yr
[#22] Maintenance and minor consumables for robotic inspection platforms and remote sensors.
Vault Storage Operations $5K/yr
[#23] Ongoing administration and climate/preservation costs for anomalous-item storage.
Cost Scenarios
📊 Baseline (baseline) $3.7M/yr
91.0% probability / year
Normal year with no major incidents; routine operations, scheduled maintenance, staff wages, insurance and R&D continue as planned.
no_incidents stable_power_and_containment
🚨 Minor Incident $4.0M/yr
8.0% probability / year +$300K vs baseline
Localized incident (small affected structure) requiring demolition, targeted response, cleanup, limited legal/PR action and forensic analysis.
single_structure_expansion small_demolition_and_cleanup limited_public_exposure
🚨 Major Incident $6.7M/yr
1.0% probability / year +$3.0M vs baseline
High-profile urban incident or multiple simultaneous incidents requiring large demolitions, major legal settlements, extensive PR, and reserve fund drawdown.
large_urban_breach major_public_exposure multiple_structural_demolitions
👥 Personnel 19 total
Role Count Notes
Security Officer / MTF Agent 6 24/7 guard coverage (multiple shifts); mapped to staff_wages [#8].
Site Supervisor / Containment Officer 1 Senior containment supervisor on-site/oversight; mapped to staff_wages [#8].
On-call Rapid Response / MTF 8 Mobile rapid-response team for power failures and containment incidents; mapped to staff_wages [#9].
Research Scientist 4 Materials/physics/containment research FTEs; mapped to staff_wages and research_and_monitoring [#14].
📋 Confidence Notes
Estimates are mid-range order-of-magnitude figures based on analyst ranges; largest uncertainties are magnet technology choice (industrial vs superconducting), site purchase vs lease, and per-incident legal/demolition expenses which can swing costs by millions.