SCP-1857
Euclid
~
medium confidence
SCP-1857
Expected annual
$2.5M
One-time setup
$1.4M
Annual recurring
$2.5M
Personnel
20
One-time setup estimated at $1,425,000 for hermetic chamber, redundancy, and equipment; annual recurring operations approximately $2,484,000 driven primarily by personnel (security, memetics, cyber, medical), contingency, equipment maintenance, and ongoing research/monitoring.
One-Time Capital Costs
Total: $1.4M
Annual Recurring Costs
Total: $2.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.5M/yr
Normal uneventful year with routine operations, scheduled research, and no major incidents.
no containment incidents
routine research and maintenance
🚨
Minor Incident
$2.6M/yr
Small containment or exposure event requiring targeted response (quarantine, limited amnestic use, repairs, increased legal/PR activity).
single personnel exposure
limited equipment contamination
increased psychiatric follow-up and limited amnestic use
🚨
Major Breach
$3.5M/yr
Significant containment failure or memetic spread requiring mass amnestic deployment, emergency construction/containment replacement, legal exposure mitigation, and large-scale remediation.
containment breach affecting multiple personnel
mass amnestic deployment
urgent replacement of containment infrastructure
Personnel
20 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | 24/7 physical security coverage (8–12 guards recommended) (#9). |
| Research Scientist / Memetics Specialist | 3 | Specialized memetics containment/research staff (2–4 recommended) (#10) involved in experiments and memetic protocols. |
| Cybersecurity / Malware Analyst | 1 | Malware/memetic analysis specialist to analyze 'cm13.exe' and operate air-gapped rigs (#8). |
| Medical Officer / Nurse | 2 | On-call medical staff and nursing allocation for acute comas, amnestic administration, and quarantine care (#14). |
| Engineer / Maintenance | 1 | Engineer/technician for robotics, HVAC, sensors, and equipment calibration/repairs (#3, #2, #28). |
| Administrative Staff | 2 | Program manager, recordkeepers, procurement and compliance overhead allocated to the project (#27). |
| Lab Technician | 1 | Hands-on technician for controlled experiments operating remote hardware under supervision (supports #3, #7, #21). |
Confidence Notes
Analyst notes provide detailed line items and ranges making cost categories well-identified, but site-specific choices (e.g., purchase vs contract CT), staffing mixes, and incident frequency are uncertain, so numeric estimates use midpoints and reasonable assumptions.