SCP-1858
Euclid
~
medium confidence
SCP-1858
Expected annual
$29.9M
One-time setup
$255.4M
Annual recurring
$27.2M
Personnel
36
One-time capital and containment construction costs are dominated by building a dedicated smallsat constellation and installing hardened infrastructure (~$196M one-time). Recurring costs are driven by liability/property-damage reserves, frequent road repairs from ~17 activations per year, and ongoing surveillance/operations (~$27.2M/yr baseline).
One-Time Capital Costs
Total: $255.4M
Annual Recurring Costs
Total: $27.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$27.2M/yr
Normal operational year using dedicated smallsat constellation for persistent surveillance; regular activations and repairs handled within planned budget.
dedicated_smallsat_in_use
no major urban manifestation
standard 17 activations/year
🚨
Leased Isr
$51.7M/yr
Operational choice to lease persistent high-end ISR instead of operating a dedicated smallsat constellation, increasing annual surveillance costs substantially.
policy_decision_to_lease_ISR
emergency short-term ISR leasing
🚨
Minor Incident
$32.2M/yr
A single escalatory manifestation on a more populated/critical road causes above-average damage, additional cleanup, and settlements beyond reserves.
urban_re-manifestation
major infrastructure damage
additional legal settlements
🚨
Major Breach
$77.2M/yr
Catastrophic urban manifestation with mass casualties, major infrastructure destruction, emergency ISR leasing, and large legal/compensation payouts.
urban_mass_casualty_event
critical infrastructure damage
widespread secondary explosions
Personnel
36 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | [#7] 6–12 guards plus supervisors to enforce closures and respond to breaches; fully-burdened staff cost included in staff_wages. |
| Monitoring Center Operator / Analyst | 10 | [#5] 24/7 remote surveillance operators and analysts; wages included in staff_wages. |
| Roadway Inspector | 4 | [#6] Four inspectors performing 48-hour inspection program; wages included in staff_wages. |
| Research Scientist | 4 | [#15] Research staff supporting containment R&D; wage component included in staff_wages and research_and_monitoring budgets. |
| EOD / Robotic Operator | 2 | [#11] Operators for remote manipulators and robotic cleanup; wages included in staff_wages and consumables in eod_event_consumables. |
| Drone Pilot / UAV Operator | 2 | [#10] Pilots/operators for rapid-assessment drone fleet; wages and ops included in staff_wages and drone_ops_maintenance. |
| Engineer / Maintenance | 2 | [#9, #19] Engineers for sensor network, power and comms maintenance; wages included in staff_wages and facilities_maintenance. |
| Program Director / Administrative Staff | 2 | [#25] Program management and interagency liaisons; wages included in staff_wages. |
Confidence Notes
Midpoint estimates used for wide analyst ranges; major uncertainties include the chosen surveillance architecture (leased ISR vs owned smallsats), legal/compensation volatility, and exact per-event repair/compensation magnitude, so confidence is medium.