SCP-1860
Euclid
✓
high confidence
SCP-1860
Expected annual
$600K
One-time setup
$565K
Annual recurring
$591K
Personnel
8
Estimated first-year one-time setup costs are $565,000 driven primarily by construction of a sound‑proof, watertight containment chamber and associated specialized equipment; ongoing annual operations are estimated at $590,750/yr, driven mainly by security staffing and site overhead/maintenance.
One-Time Capital Costs
Total: $565K
Annual Recurring Costs
Total: $591K/yr
Cost Scenarios
📊
Baseline
(baseline)
$591K/yr
Normal, uneventful year with standard operations and no major incidents.
no incidents
routine maintenance
standard research schedule
🚨
Minor Incident
$616K/yr
Small containment incident (localized spill, minor equipment failure) requiring overtime, extra cleanup and minor repairs.
localized ink spill
minor HVAC or pump failure
small repair or panel replacement
🚨
Major Breach
$791K/yr
Significant containment breach or tear (analogous to Incident 1860-A) causing equipment replacement, medical/legal costs, and extensive repairs.
large material tear
personnel injuries/hearing loss
major reconstruction of chamber
🚨
Relocation Event
$616K/yr
Planned or emergency relocation of SCP-1860 requiring bespoke transport, escorts, and temporary site setup.
research relocation
site decommissioning
emergency transfer
🚨
Research Breakthrough Requiring Scale Up
$741K/yr
Discovery that requires expanded research program, additional equipment, or temporary staff hires.
new anomalous property discovered
scale‑up of memetic testing
external consultant/contractor engagement
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#8] Six guards to provide continuous coverage (2 per shift, 3 shifts). Salary+benefits included in staff_wages. |
| Engineer / Maintenance (Site Technician) | 1 | [#9] One full‑time site technician for HVAC, pumps, camera and door maintenance. |
| Research Scientist | 0.7 | [#10] Fractional research allocation (0.5 materials scientist + 0.2 memetics/psych) prorated into staff costs. |
| Custodial / Decontamination | 0.3 | [#11] Part‑time custodial/decontamination support (labor portion of custodial estimate included in staff_wages). |
Confidence Notes
Detailed analyst estimates provided for nearly every line item (construction, staffing, equipment, and recurring service costs), enabling a high‑confidence aggregation; remaining uncertainty arises from contingency sizing and event frequency assumptions.