SCP-1917
Safe
~
medium confidence
SCP-1917
Expected annual
$2.2M
One-time setup
$4.4M
Annual recurring
$2.1M
Personnel
13
Initial capital costs are concentrated on site acquisition, structural work, monitoring hardware and a contingency decommissioning reserve; total one-time setup is approximately $4.43M. Annual operating costs are dominated by personnel, information suppression/cover operations, and contingency/insurance, totaling about $2.139M per year.
One-Time Capital Costs
Total: $4.4M
Annual Recurring Costs
Total: $2.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.1M/yr
Normal, uneventful year with steady operations and no major incidents.
routine operations
scheduled maintenance
regular research activity
🚨
Minor Incident
$2.2M/yr
Small containment incident or localized equipment failure requiring repairs, overtime, and short-term legal/PR work.
localized equipment failure
minor breach requiring repairs
short-term PR/legal response
🚨
Political Exposure
$2.6M/yr
Significant leak or local political attention forcing expanded suppression, legal action and temporary operational slow-down.
media leak
local government scrutiny
legal challenge
🚨
Major Relocation
$4.6M/yr
Forced decommissioning/relocation or major containment upgrade requiring heavy transport, bespoke containment cell construction and extended operations.
catastrophic structural failure
forced relocation order
major containment breach
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Site Director / Executive Staff | 1 | [#7] Site director (salary included in staff wages). |
| Research Scientist | 2 | [#7] Two researchers to study SCP-1917 and GoI-004F (salaries included). |
| Engineer / Maintenance | 1 | [#7] One maintenance technician (salary included). |
| Administrative Staff / Janitorial | 1 | [#7] One admin/janitorial position (salary included). |
| Security Officer / MTF Agent | 8 | [#7] Eight security guards to cover 24/7 shifts (salaries included). |
Confidence Notes
Analyst notes provide numeric estimates and midpoints for most line items, but several items (contingency, insurance, decommissioning) are broad ranges and the SCP's unusual features create some uncertainty in long-run incident frequency and escalation costs.