SCP-1955
Euclid
~
medium confidence
SCP-1955
Expected annual
$5.0M
One-time setup
$6.1M
Annual recurring
$4.7M
Personnel
29
One-time setup costs are moderate-to-high (~$6.14M) driven primarily by a large contingency reserve and research/IT buildouts; annual baseline operations are roughly $4.70M/year driven by MTF staffing, cyber monitoring, legal/takedown operations, and ongoing research/medical expenses.
One-Time Capital Costs
Total: $6.1M
Annual Recurring Costs
Total: $4.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.7M/yr
Normal year with routine monitoring, occasional small recoveries, and no major public exposure.
no large leaks
routine monitoring and takedowns
standard MTF deployments
🚨
Minor Incident
$5.3M/yr
Localized leak or uploader identified requiring multi-day forensic work, targeted MTF retrieval, international takedown and elevated PR/legal response.
targeted online leak
small-scale international retrieval
temporary PR/legal surge
🚨
Major Breach
$24.7M/yr
Widespread viral dissemination leading to mass exposures, large-scale amnestic operations, mass counseling, international diplomatic operations and full contingency activation.
viral public leak
mass exposures (thousands)
activation of contingency reserve
Personnel
29 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 14 | Primary field operatives responsible for tracking uploaders, retrievals and field amnestic administration. [#6] |
| Research Scientist | 4 | Cognitive neuroscientists and media perception researchers conducting studies and supporting reversal research. [#15][#16] |
| Cybersecurity / Forensic Analyst | 3 | Monitor torrents, perform forensic tracing and takedown support. [#7][#11] |
| Medical Officer | 2 | Licensed medical personnel to administer amnestics and provide post-procedure care. [#5] |
| Engineer / Maintenance | 2 | Maintain vault HVAC, secure transport equipment, IT and viewing-lab systems. [#1][#2][#24] |
| Administrative Staff | 2 | Logistics, chain-of-custody documentation, record keeping and contracting support. [#1][#12] |
| Site Director / Executive Staff | 1 | Program oversight, liaison with Foundation command and contingency decision-making. |
| Contracts / Legal Liaison | 1 | Manage takedown vendors, cover narratives and legal engagements. [#9] |
Confidence Notes
Analyst notes provide detailed line items and ranges, enabling a reasoned budget, but wide cost ranges and uncertain incident frequency (per‑incident count per year) reduce precision; contingency sizing is judgmental.