SCP-1956
Euclid
~
medium confidence
SCP-1956
Expected annual
$3.9M
One-time setup
$11.4M
Annual recurring
$3.8M
Personnel
32
One-time setup is approximately $10.7M driven by facility construction and security/equipment installs; recurring operating costs are approximately $3.79M/yr driven by salaries, research, contingency and facility operations.
One-Time Capital Costs
Total: $11.4M
Annual Recurring Costs
Total: $3.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.8M/yr
Normal operational year with no major containment incidents; routine recurring expenditures only.
no breaches
routine research and maintenance
regular staff rotations
🚨
Minor Incident
$4.3M/yr
Localized breach or medical emergency requiring rapid-response, overtime, repairs and limited external medical outsourcing.
small containment breach
serious injury/medical intervention
equipment repair and emergency overtime
🚨
Major Breach
$7.3M/yr
Significant containment failure with multiple injured instances, large repairs, major legal/PR/cover costs and potential replacement of infrastructure.
catastrophic containment breach
multiple surgical/medical evacuations
major facility repairs and public exposure mitigation
Personnel
32 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#3] 24/7 guard coverage for 53 chambers - approximate staffing. |
| Containment Technician | 8 | [#3] Technicians for chamber maintenance, handling and day-to-day containment tasks. |
| Research Scientist | 4 | [#3, #17] Behavioral, xenolinguistics and anomalous physiology researchers. |
| Medical Officer | 3 | [#3, #6, #7] Medical/veterinary staff for routine checks and emergency surgeries. |
| Engineer / Maintenance (Robotics) | 2 | [#3, #9, #10] Robotics and small-engine technicians for SCP-1956-1 maintenance. |
| Janitorial / Sanitation | 2 | [#3, #15] Laundry, waste handling and sanitation staff. |
| Site Manager / Facility Manager | 1 | [#3] Overall site management and administrative oversight. |
Confidence Notes
Many line items are medium-confidence estimates (facility construction, staffing) but several conditional items (advanced imaging purchases, severity of breaches, secrecy/cover costs) are uncertain; ranges provided in analyst notes introduce variance.