SCP-1972
Euclid
~
medium confidence
SCP-1972
Expected annual
$6.6M
One-time setup
$28.8M
Annual recurring
$6.2M
Personnel
38
One-time setup and high-assurance containment buildout are the dominant capital costs (specialized silo-style B-block, coatings, redundant systems and large contingency reserves). Annual operations are driven by security and specialist staffing, ongoing research/monitoring, and utilities/maintenance (~$6.2M/yr).
One-Time Capital Costs
Total: $28.8M
Annual Recurring Costs
Total: $6.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.2M/yr
Normal operational year with no major incidents; routine maintenance, staffing and research continue.
routine_operations
scheduled_research_campaigns
🚨
Minor Incident
$7.4M/yr
Localized plasma discharge or limited containment breach causing equipment damage, short downtime, and limited personnel injuries.
localized_plasma_discharge
equipment_damage
minor_personnel_casualties
🚨
Major Breach
$16.2M/yr
Severe B escape or sustained plasma attacks resulting in multiple fatalities, large-scale equipment loss and possible site demolition or full rebuild.
B_escape_and_plasma_attack
multiple_fatalities
site_demolition_needed
Personnel
38 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 30 | [#7] 24/7 armed security rotations, female-only contact enforcement and rapid-response teams (estimate from 28–40 FTE). |
| Research Scientist | 3 | [#8, #12] Xenobiologists/materials scientists performing ongoing research and monitoring. |
| Engineer / Maintenance | 2 | [#3, #13, #26] Containment and thermal systems engineers maintaining cooling, HVAC, gens and structural inspections. |
| Robotics Technician | 1 | [#4, #17] Operates and maintains remote manipulators, interceptors and telepresence rigs. |
| Medical Officer | 1 | [#22, #23] Xenomedical support, surgical coordination and quarantine/medical consumables oversight. |
| Psychologist / Linguist | 1 | [#8, #21] Psychological care for staff and translation / behavioral liaison for SCP-1972-A (joual French). |
Confidence Notes
Line-item cost ranges in the analyst notes are detailed and map cleanly to categories, but many containment-specific technical requirements (unknown composition of SCP-1972-B, frequency/severity of plasma events) introduce material uncertainty in capital scope and incident probability; medium confidence in order-of-magnitude estimates.