SCP-1973
Euclid
~
medium confidence
SCP-1973
Expected annual
$1.6M
One-time setup
$1.4M
Annual recurring
$1.5M
Personnel
17
Initial capital outlay is approximately $1.33M driven by site acquisition/construction, hardened garage bay, heavy-equipment purchase, and decommissioning reserves; recurring annual costs are approximately $1.54M driven by salaries (security + research + contained crew), facility operations (HVAC/power), contingency reserves and ongoing monitoring.
One-Time Capital Costs
Total: $1.4M
Annual Recurring Costs
Total: $1.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.5M/yr
Normal uneventful year with scheduled monitoring, routine maintenance, and ongoing research; no major incidents or environmental remediation events.
no incidents
routine testing only
planned maintenance
🚨
Minor Incident
$1.6M/yr
Small containment incident (lost test vehicle requiring recovery, localized contamination control, small remediation and contractor mobilization).
vehicle sinks and leaks
small-scale remediation required
contractor heavy-lift mobilization
🚨
Major Environmental Remediation
$2.0M/yr
Significant contamination or escalation requiring large-scale remediation, extended contractor engagement, regulatory fines/permits, and elevated PR/legal costs.
major contamination discovered
regulatory enforcement action
extended multi-week remediation
Personnel
17 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#5, #6] 4–6 rotating guards plus 1 supervisor; includes staffing to ensure one guard on site at all times and supervisory coverage. |
| Research Scientist | 2 | [#13] Geotechnical/materials/anomalous-conduct specialists (senior scientists). |
| Research Technician | 2 | [#13, #14] Field technicians for coring, GPR operation, sensors and sample handling. |
| SCP-1973-1 Crew | 4 | [#8] Contained tank crew retained onsite (3–5 personnel); baseline assumes 4. |
| Site Director / Administrative Staff | 2 | [#24] One site manager and one administrative/clerical staff to handle scheduling, procurement and reporting. |
| Engineer / Maintenance | 1 | [#9, #10, #18] Technician/engineer for garage systems, heavy-equipment maintenance and periodic mechanical support. |
Confidence Notes
Estimates are based on analyst ranges and midpoints; many line items (land costs, contractor fees, remediation) vary widely by location and incident severity, producing moderate uncertainty despite detailed line-item coverage.