SCP-1982
Safe
~
medium confidence
SCP-1982
Expected annual
$1.8M
One-time setup
$1.2M
Annual recurring
$1.7M
Personnel
13
Initial one-time setup is roughly $1.17M driven by equipment, vehicles/drones, and contingency capital; steady-state annual costs are ~ $1.74M/year driven primarily by staff wages (24/7 security) and ongoing monitoring, legal/PR, and research overhead.
One-Time Capital Costs
Total: $1.2M
Annual Recurring Costs
Total: $1.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.7M/yr
Normal uneventful year with steady-state monitoring, staffing, routine maintenance, and scheduled research activities.
no SCP-1982-1 appearance
no major incidents
standard operations only
🚨
Minor Incident
$1.8M/yr
An SCP-1982-1 appearance that is intercepted or turned away with additional overtime, scouting, and modest PR/legal activity.
SCP-1982-1 appears on 08/23
interception requires overtime and extra scouting
minor PR/cover expenditures
🚨
Major Incident
$2.1M/yr
Containment failure of human subject (individual enters and does not return) triggering forensic response, larger PR/legal payouts, and extended investigation.
individual enters SCP-1982 and is not recovered
forensic cleanup and evidence preservation
large PR/legal settlements and emergency response
🚨
Research Breakthrough Requiring Scale Up
$2.0M/yr
Discovery or decision to actively test/enter SCP-1982 requiring temporary secure test facilities and one-time containment upgrades.
approved active testing/entry
behavioral change necessitating secure chamber
rapid procurement of temporary safe facilities
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | [#4] Minimum 8–10 FTE security officers (budgeted as 10 FTEs for 24/7 coverage and shifts; salary assumptions from analyst notes). |
| Research Scientist | 3 | [#11] 2–4 full-time researchers/technical staff; budgeted as 3 FTE researchers/technicians (salaries included in staff_wages). |
Confidence Notes
Analyst notes provide detailed line-item ranges and containment procedures; numerical estimates use midpoints and conservative choices. Significant uncertainty remains in low-frequency, high-cost items (legal settlements, escalation capital) and regional wage/contractor variability, so confidence is medium.