SCP-2040
Euclid
~
medium confidence
SCP-2040
Expected annual
$1.9M
One-time setup
$1.5M
Annual recurring
$1.9M
Personnel
9
Estimated initial capital outlay of $1,500,000 for a shielded, non‑wireless containment cell, emergency systems, and reserve funds; recurring annual costs are approximately $1,858,000/year driven primarily by staff wages, ongoing research, facility overhead, and specialist support.
One-Time Capital Costs
Total: $1.5M
Annual Recurring Costs
Total: $1.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.9M/yr
Standard year with routine operations, scheduled research, maintenance, and no major incidents.
normal_operations
scheduled_research
routine_maintenance
🚨
Minor Incident
$2.1M/yr
Limited containment incident (localized activation, small repair/cleanup, short legal/PR response) requiring emergency response and repairs.
unexpected_activation
small_radiation_detection
localized_hardware_failure
🚨
Major Breach
$4.9M/yr
Full containment breach or demonstration of hazardous capability (e.g., weaponization or significant radiological release) requiring large-scale remediation, external contracts and potential site evacuation.
containment_breach
demonstrated_hazardous_capability
regulatory_exposure
Personnel
9 total
| Role | Count | Notes |
|---|---|---|
| Project Lead / Research Director | 1 | [#11] Senior salaried lead coordinating containment and research (~$150k salary assumed). |
| Research Scientist / Specialist | 2 | [#11, #15] Specialists conducting AI/robotics forensic analysis and experiments (~$100k each). |
| Technician / Engineer | 2 | [#11, #7] Technical staff maintaining HVAC, backup power, monitoring equipment and handling safe manipulations (~$60k each). |
| Security Officer / MTF Agent | 4 | [#11, #12] Security personnel trained in SOPs and breach protocols (~$45k each; included in staff_wages). |
Confidence Notes
Analyst notes provide detailed line items and ranges, allowing a reasoned estimate, but the object's anomalous claims (nuclear power, ion weapon) introduce tail-risk and wide cost variance for escalation scenarios, reducing overall confidence.