SCP-2049
Keter
~
medium confidence
SCP-2049
Expected annual
$2.3M
One-time setup
$4.2M
Annual recurring
$2.2M
Personnel
11
Initial setup requires approximately $4.15M one-time (driven by emergency contingency reserves and vehicle purchase) and ongoing operations cost about $2.24M/year, dominated by personnel, administrative overhead, and an annual damage/compensation reserve.
One-Time Capital Costs
Total: $4.2M
Annual Recurring Costs
Total: $2.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.2M/yr
Normal, uneventful year with routine monitoring, occasional broadcasts and no major public incidents.
routine broadcasts
no major property damage
standard operations
🚨
Minor Incident
$2.3M/yr
Small localized anomalous event requiring targeted repairs, limited amnestic administrations, and minor extra legal/PR work.
localized property damage
several civilian witnesses
limited PR/amnestic usage
🚨
Major Public Incident
$3.2M/yr
A forecast causes notable damage or public exposure requiring large repairs, legal payouts, significant MTF escalation and replacement of infrastructure.
moderate-to-severe damage
public scrutiny / investigations
deployment of additional MTF resources
🚨
Catastrophic Disaster
$5.2M/yr
Large-scale anomalous weather event centered on Manningtree causing major destruction, mass amnestic operations, national-level coverups and multi-site coordination.
widespread structural damage
mass-casualty or mass-exposure
national/international response
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#3] Primary on-site security staff drawn from the 10 resident personnel. |
| Field Agent | 2 | [#3] Field/rapid-response agents included in resident team for rotations and deployments. |
| Research Scientist | 1 | [#3, #21] Researcher/analyst assigned to monitor SCP-2049 and liaise with Site 294. |
| Administrative Staff | 1 | [#3, #26] Local administrative/support personnel included in resident staffing. |
| Medical Officer | 1 | [#14] On-call medic/clinician stipend for amnestic administration and trauma care (separate stipend included in staff wages). |
Confidence Notes
Estimates derive from detailed analyst line items and typical Foundation practices but include significant judgment calls (e.g., contingency sizing, midpoint for large one-time contingency). Unpredictability of anomalous events lowers confidence from high.