SCP-2050
Safe
~
medium confidence
SCP-2050
Expected annual
$1.1M
One-time setup
$1.4M
Annual recurring
$1.0M
Personnel
11
Initial capital expenditures are approximately $1,410,000 driven primarily by enclosure construction and one-time setup (biome buildout, HVAC, monitoring, and reserves). Ongoing annual costs are approximately $1,036,000 driven by staff wages, research/monitoring, facilities maintenance, and recurring animal care and security.
One-Time Capital Costs
Total: $1.4M
Annual Recurring Costs
Total: $1.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.0M/yr
Normal operational year with routine maintenance, scheduled research, and no major incidents.
routine_operations
scheduled_research
no_major_incidents
🚨
Minor Incident
$1.1M/yr
Localized civil unrest among SCP-2050 members, small containment incident or limited disease outbreak requiring overtime, repairs, and emergency veterinary intervention.
internal_brawl_or_civil_unrest
small_disease_outbreak
limited_containment_breach
🚨
Major Breach
$1.6M/yr
Large-scale civil war within SCP-2050 or a major containment breach leading to extensive injuries, structural repairs, public exposure mitigation, and legal payouts.
widespread_internal_conflict
major_containment_failure
public_exposure
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Animal Husbandry / Caretaker | 4 | [#7] Full-time caretakers to manage feeding, cleaning, enrichment and daily handling (4 FTE budgeted into staff wages). |
| Security Officer / MTF Agent | 3 | [#14] Incremental dedicated guards assigned to enclosure and monitoring (3 guards budgeted under security wages). |
| Research Scientist | 2 | [#16] Behavioral/ethology researchers (personnel budget included in research_and_monitoring). |
| Veterinarian / Veterinary Technician | 1 | [#8] On-site or part-time veterinarian coverage and emergency veterinary services (budgeted under recurring veterinary care). |
| Site Envoy / Liaison | 1 | [#15] One designated Foundation envoy responsible for diplomatic contact and cultural liaison (salary and training budgeted). |
Confidence Notes
Analyst notes provide detailed line items and ranges, enabling mid-confidence estimates; however uncertainty remains in frequency/severity of internal unrest and energy/maintenance needs for a large biome (ranges are wide), so confidence is not high.